The list below gives the titles of some of the Software Engineering Group Notes from 1 to 142. An index for the complete set has not been discovered. If several drafts of the same report are Notes, only the latest is available as a PDF.
| Number | Title | Author | Date |
|---|---|---|---|
| 1 | SEG Annual Report | RWW | 17.10.84 |
| 3 | Production of SEG Notes: Use of maco package and proforma | DRG | 17.10.84 |
| 14 | ACARD WG on SE | RWW | 8.1.85 |
| 19 | Visit to Keele 25.1.85 | RWW | 29.1.85 |
| 21 | UK UNIX User Group Mtg 1.2.85 | DRG | 5.2.85 |
| 23 | ACARD WG on SE Visit to NCC 5.2.85 | RWW | 12.2.85 |
| 24 | ACARD WG on SE Meeting 8.2.85 | RWW | 13.2.85 |
| 35 | Equipment Loan Pool of PERQs | RWW | 1.4.85 |
| 39 | ACARD WG on SE: The Danger to Public Safety Draft 2 | RWW | 16.4.85 |
| 54 | Move to R1 - Requirements | LEV | 11.6.85 |
| 55 | ESRC Public Policy Study Group Seminar: Impact of New Technology 7.6.85 | RWW | 12.6.85 |
| 59 | ACARD WG on SE: The Danger to Public Safety Draft 4 | RWW | 4.7.85 |
| 60 | ACARD WG on SE: The Danger to Public Safety | RWW | 10.7.85 |
| 64 | SEG FYFL 1986/92 | RWW | 31.7.85 |
| 66 | Dimensional design: Minutes of Meeting 31.7.85 | RWW | 6.8.85 |
| 68 | National Programmes | RWW | 2.9.85 |
| 72 | Dimensional Design: Minutes of Meeting 25.9.85 | DRG | 27.9.85 |
| 74 | SEG Annual Report Sept 84 - Sept 85 | RWW | 30.9.85 |
| 82 | END GAME DEBATE Some Questions | RWW | 13.11.85 |
| 83 | END GAME DEBATE Some Agenda Items | RWW | 13.11.85 |
| 84 | END GAME DEBATE Have we Implemented the Yellow Book? | RWW | 13.11.85 |
| 87 | Dimensional design: Informal Requirements Specification Draft 2 | DRG | 26.11.85 |
| 94 | Alvey SE Visit to USA Oct 85 Private Version | RWW | 4.11.85 |
| 95 | Alvey SE Visit to USA Oct 85 | RWW | 4.11.85 |
| 96 | ACARD WG on SE Final Report Draft 8.6 | RWW | 17.3.86 |
| 101 | SE Research at RAL | DAD | 13.2.86 |
| 106 | Minutes of SIG-SE Meeting 28 Feb 1986 Draft 1 | RWW | 4.3.86 |
| 107 | After Alvey: Some Headings | RWW | 4.3.86 |
| 108 | DTI/MOD Alignment Text of RWW's Presentation Draft 1 | RWW | 6.3.86 |
| 109 | DTI/MOD Alignment Text of RWW's Presentation | RWW | 13.3.86 |
| 110 | ACARD WG on SE Final Report | AT/RWW | 21.3.86 |
| 111 | Dimensional design: Requirements Specification for Protype DRAFT 2.2 | DRG | 21.3.86 |
| 113 | BASSMAT Further Thoughts | RWW | 26.3.86 |
| 115 | After Alvey: A Note for the IEE Mtg 11/4/86 | RWW | 2.4.86 |
| 116 | Dimensional Design: A Layout Algorithm for the Labelled Cuboid Model | RWW/DRG | 14.4.86 |
| 125 | China Trip Report May 1986 | RWW | 29.5.86 |
| 126 | Staffing | DAD | 2.6.86 |
| 127 | IPSE 2.5 Note 2 Monthly Progress Report May 1986 | CPW | 2.6.86 |
| 130 | Visit to South China IT, Guangzhou April-May 1986 | RWW | 3.6.86 |
| 131 | IPSE 2.5 Note 2 Monthly Progress Report May 1986 | CPW | 10.6.86 |
| 133 | Alvey Funded Effort at RAL SE Activities | RWW | 13.6.86 |
| 134 | FYFL 1987-1993 | RWW | 16.6.86 |
| 135 | Estimates 1987/88 Draft 1 | RWW | 16.6.86 |
| 136 | Estimates 1987/88 | RWW | 17.6.86 |
| 138 | ACARD WG on SE Notes for G Holmes Speech to Alvey 86 Conference | RWW | 26.6.86 |
| 142 | Dimensional Design: Requirements Specification for Prototype, Draft 3 | DRG | 20.8.86 |
| 149 | Alvey IPSE Strategy and Academia | RWW | 8.10.86 |