Contact us Heritage collections Image license terms
HOME Literature Reactors
Further reading □ Overview110-inch SynchrocyclotronVEC (Variable Energy Cyclotron)Other publications
Contact us Heritage archives Image license terms

Search

    A.E.R.E HARWELL
HarwellAccelerators
A.E.R.E HARWELL
HarwellAccelerators
Further reading

Overview
110-inch Synchrocyclotron
VEC (Variable Energy Cyclotron)
Other publications

The 110-inch Synchrocyclotron

Notes from a meeting to discuss the layout of the General Physics Section of Hangar 7 (22 May 1946) Re-consideration of shielding required for Harwell cyclotron (11 July 1946) Minutes of meeting at Shell Mex House to discuss cyclotron magnet (13 August 1946) Position of work on cyclotron (3 September 1946) JBA/BRP Cyc/2: Minutes of meeting at Abell House to discuss the final sketches of the layout of the cyclotron in Hangar 7 (11 September 1946) Cyclotron Group progress report (30 October 1946) Comments on meetings held on the cyclotron (date unspecified but assumed to be 1946) Neutron flux and screening (22 April 1947) Note to Skinner from (presumably) Snowden explaining the choice of cylindrical rather than tapered poles for the cyclotron (25 April 1947) RF problems associated with increasing the maximum energy of the Harwell Cyclotron above 170 MeV (Note by M Snowden, 21 April 1948)

⇑ Top of page
© Chilton Computing and UKRI Science and Technology Facilities Council webmaster@chilton-computing.org.uk
Our thanks to UKRI Science and Technology Facilities Council for hosting this site