The list below gives the titles of the DCS Notes from 1 to 200.

Number Title Author Date
1 Visit to M/C University 24.1.78. RWW 30.1.78
2 Visit to UMIST on 24.1.78. RWW 30.1.78
3 Mtg with A H Bond, QMC on 17.2.78. FRAH 20.2.78
4 Mtg with Prof Kirstein, UCL, 27.2.78. FRAH 28.2.78
5 Visit to Prof Evans, Loughborough, 14.3.78. FRAH 17.3.78
6 Visit to David Jenkins, Glasgow, 3.2.78. RWW 17.3.78
7 Visit to Dr G Coulouris, QMC, 1.3.78. FRAH 20.3.78
8 Visit to York, 24.2.78. RWW 20.3.78
9 Visit to Cambridge, 3.3.78. RWW 21.3.78
10 Visit to Prof Lanigan; 13.3.78. RWW 21.3.78
11 Visit to Kent U, 13.3.78. RWW 21.3.78
12 Mtg of Data Flow Grps & Coordinators, 15.3.78. RWW 21.3.78
13 Visit of Dr Treleaven, Newcastle, 6.3.78. RWW 22.3.78
14 Visit to C Hawksley, Keele U, 21.3.78. FRAH 28.3.78
15 Visit to Dr K Bennett & Mr R Hull, Keele U, FRAH 28.3.78
16 Visit to Mr G Egan & S Wathanasin, Manchester U FRAH 28.3.78
17 Visit to Imperial College, 21.2.78. GAR 30.3.78
18 Mtg with Prof Grimsdale, Sussex U, State House. RWW 31.3.78
19 Visit to Milner & Plotkin, Edinburgh U, 5.4.78. RWW 6.4.78
20 Visit to Warwick - Whitby-Strevens. RWW/FRAH 13.4.78
21 Visit to Aspinall, (CYBA-M) Swansea. RWW 7.6.78
22 Visit to Randall's Reliability Project, Newcastle. RWW 16.6.78
23 Visit to Dr Lauer, Newcastle. RWW 16.6.78
24 Visit to Prof Hoare, Oxford. RWW 22.6.78
25 Mtg with Shellness, Edinburgh, at IEE, Savoy RWW 28.6.78
26 Visit to Dr A Sloman, Sussex U, 16.8.78. RWW 17.8.78
27 Visit to Dr G Coulouris, QMC, 29.9.78. RWW 3.10.78
28 Rob Witty's USA Trip, 8-22 July 1978. RWW 18.8.78
29 Visit to Prof Evans, Loughborough, 3.11.78. RWW 21.11.78
30 Visit to Dr Paker, PCL, 24.11.78. RWW 30.11.78
31 Visit to Prof Aspinall, UMIST. RWW
32 Visit of Dr K Bennett to RL, 27.2.79. RWW 2.3.79
33 First Mtg of Kirstein Monitoring Panel, 28.2.79. RWW 7.3.79
34 Mtg with Prof Grimsdale & Dr Halsall, Sussex U. RWW 23.3.79
35 PDP11 Network Users Mtg, 14.3.79. RWW 30.3.79
36 Visit of Mr S E Hersom, Hatfield Poly, 19.3.79. RWW 30.3.79
37 Notes on Mtg with Dr Sheppard, Strathclyde U. RWW 30.3.79
38 Mtg with Dr F K Hanna, Dr OR Hinton & Dr K R Dimond, Kent U, 25.3.79. RWW 5.4.79
39 Mtg with Prof Goldsack, Dr Johnson, Dr Sloman & Mr Kramer, Imperial College, 27.4.79. RWW 3.5.79
40 Board of Visitors to Prof R Grimsdale, Sussex U, 15.5.79. RWW 17.5.79
41 Mtg with Prof G Coulouris, M Lamming & I Page at QMC on 23.5.79. RWW 17.5.79
42 DCS UNIX LICENCES - V6 to V7 upgrade problem. RWW 15.6.79
43 EMR CONTRACTS - Current Situation RWW 15.6.79
44 SIGS & WORKSHOPS - Progress Report. RWW 15.6.79
45 DCS MAILSHOT - Circulation List. RWW 15.6.79
46 CURRENT FINANCIAL YEAR 79/80 ending 31.3.80. RWW 15.6.79
47 FINANCIAL ESTIMATES FOR FY 80/81 ending 31.3.81. RWW 15.6.79
48 DCS EQUIPMENT POOL - Current Situation RWW 15.6.79
49 DISTRIBUTED COMPUTING NOTES - Reference List RWW 20.6.79
50 DCS FILING SYSTEM - Reorganisation RWW 22.6.79
51 COORDINATOR'S PROGRESS RPT (3 May - 3 July 79) RWW 22.6.79
52 ESE INFO & COMMS SPP - Mtg with Wilde, RL, 21.6.79. RWW 25.6.79
53 VISIT RPT - Demos Project, Dr P Wilkinson, NPL, RWW 18.6.79. RWW 25.6.79
54 POLICY - Future DCS Policy from 1980 onwards. RWW 28.6.79
55 PANEL MEETING - Notes on P Mtg on 3 July at IEE. DAD 5.7.79
56 DCS FILE LIST - As at 6 July 1979 CB 6.7.79
57 VISIT REPORT - Dr Thomas, Director, ERCC - 2.7.79 RWW 9.7.79
58 INVESTIGATORS Bull & Sayers, Hatfield, 5.7.79 RWW 30.7.79
59 CURRENT FINANCIAL YEAR 79/80, ending 31.3.80. RWW 24.7.79
60 DCS FILE LIST, as at 30 July 1979. CB 30.7.79
61 DCS NOTES REFERENCE LIST (Updated). CB 30.7.79
62 DCS QUARTERLY PROGRESS REPORT (April - June 79) RWW 1.8.79
63 INVESTIGATORS, Visit to Dr Osmon, Westfield,26.7.79 DAD 1.8.79
64 DCS MAILSHOT Circulation List RWW 3.8.79
65 EQMT POOL MGT - Outstanding Requests to Borrow DAD 7.8.79
66 INVESTIGATORS, 2nd Mtg of Kirstein Monitoring DAD Panel, UCL, 7.8.79 DAD 13.8.79
67 DCS FILE LIST, as at 20 August 1979. CB 20.8.79
68 CURRENT FINANCIAL YR 79/80, ending 31.3.80 RWW 4.9.79
69 RL SUPPORT ACTIVITIES Computing Facilities Operational Requirements RWW 11.9.79
70 DCS FILE LIST - As at 13 Sept 79. CB 13.9.79
71 CURRENT FINANCIAL YR 79/80, ending 31.3.80 RWW 19.9.79
72 INVESTIGATORS, Whitby-Strevens, Technical comments on future of project. RWW 19.9.79
73 INVESTIGATORS, Notes on a visit by Jim Cunningham, Imperial College, 4.9.79. DAD 11.9.79
74 INVESTIGATORS, Notes on a mtg with Dr C Whitby-Strevens, Warwick, 11.9.79 DAD 19.9.79
75 VISITS, Notes on a visit to ICL West Gorton, 12.9.79 DAD 19.9.79
76 INVESTIGATORS, Notes on a mtg with J Gurd and I Watson, 13 Sept 79. DAD 20.9.79
77 VISITS, Notes of a mtg with Mrs Hughes, Powell & Coleman at UMIST on 14.9.79. DAD 21.9.79
78 VISITS, Nots on a mtg with Aspinall & Dagless of UMIST, 14.9.79. DAD 21.9.79
79 DCS FILE LIST - as at 24 Sept 1979 CB 24.9.79
80 PANEL PAPER - Second European Conf on Parallel & Distributed Processing. RWW 24.9.79
81 PLANNING, RL Support Facilities RWW 24.9.79
82 PANEL PAPER, The Demand for Unix Licences RWW 24.9.79
83 PANEL PAPER, Requests for Loan of Pool Eqmt DAD 25.9.79
84 PANEL PAPER, Academic Coordinator's Progress Rpt 3 July - 18 Oct 1979 RWW 25.9.79
85 WORKSHOPS, Logica VTS ~ Cambridge Ring RWW 1.10.79
86 FINANCE - FYFL for FY 79 / 80 RWW 1.10.79
87 CURRENT FINANCIAL YEAR 79/80, ending 31.3.80 RWW 2.10.79
88 FINANCE, Current Year FY 79/80, ending 31.3.80 RWW 3.10.79
89 FINANCE, Estimates Year FY 80/81, ending 31.3.81 RWW 3.10.79
90 FINANCE, FYFL for FYs 81-86 RWW 3.10.79
91 RL SUPPORT, Computing Facilities, Op Requirements RWW 5.10.79
92 DCS MAILSHOT, Circulation List RWW 8.10.79
93 EQMT POOL MANAGEMENT, Requests for Loan of Pool Eq DAD 10.10.79
94 EXTERNAL LINKS, ICL Proposal RWW 10.10.79
95 PANEL PAPER, Provision of 'Cambridge Rings' via the DCS Equipment Pool. RWW 15.10.79
96 FINANCE, Current Yr FY 79/80, ending 31.3.80 RWW 15.10.79
97 UNIX, Visit to Kirstein at UCL and Coulouris at QMC, to discuss Unix, 17.10.79. CP 30.10.79
98 UNIX Tech Note 1, Setting up UNIX (6th Edition) Initial Configuration. CP 30.10.79
99 Unix Discussion Paper 1, Disk Utilisation. CP 30.10.79
100 DCS File List, at 26 Oct 79. CB 26.10.79
101 UNIX Tech Note 2, Systime 5000 Tech Info. CP 30.10.79
102 Visit of Dr Osmon, Westfield, 12.11.79 RWW 13.11.79
103 Visit to ASWE, 15 Oct 79. DAD 13.11.79
104 Visit to Brian Randell, 25 Oct 79. Reliability project. DAD 13.11.79
105 Visit to Peter Lauer, 25 Oct 79. DAD 13.11.79
106 Visit to Dr P Treleaven & Prof B Randell, Data Flow project, 26 Oct 79 DAD 13.11.79
107 Visit to Dr Mitrani, Newcastle, 26 Oct 79. DAD 13.11.79
108 PANEL MEETING, 18 October 1979. DAD 14.11.79
109 FINANCE, Current Year FY 79/80 ending 31.3.80 RWW 19.11.79
110 DCS NOTES INDEX, at 19.11.79 CB 19.11.79
111 PROGRESS REPORT, RL Annual Report 1979. RWW 21.11.79
112 RL SUPPORT, Cambridge Ring. RWW 22.11.79
113 INVESTIGATORS, Visit from Patterson, Glasgow, 15.11.79 DAD 3.12.79
114 Visit to AUWE, 14.11.79. DAD 4.12.79
115 PERQ Evaluation Exercise, Outline Plan. RWW 4.12.79
116 FINANCE, Current Yr FY 79/80 ending 31.3.80. RWW 4.12.79
117 DCS FILE LIST, AS AT 6 December 1979. CB 6.12.79
118 INVESTIGATORS, Review of Hoare's grant, 5.12.79 DAD 7.12.79
119 PERQ, Mtg with ICL, ERCC, Edinburgh 6.12.79. RWW 11.12.79
120 VISITS, Visit to Scicon, 20.11.79. DAD 11.12.79
121 VISITS, Further Notes on visit to Scicon, 20.11.79. DAD 11.12.79
122 VISITS, Visit to Prof Florentin, Birkbeck, 4.12.79. RWW 11.12.79
123 VISITS, Visit to Mr Florentin, Westfield, 4.12.79. RWW 11.12.79
124 CAMBRIDGE RING, Mtg at Cambridge on 28.11.79. RWW 12.12.79
125 SUPPLIERS, Visit to Dicoll on 29.11.79. RWW 11.12.79
126 DCS MAILSHOT, Circ List RWW 20.12.79
127 EQMT POOL, Requests for Loan of Pool Eqmt DAD 20.12.79
128 INVESTIGATORS, Visit to Dowsing UEA, 10.12.79. DAD 20.12.79
129 DRAFT PANEL PAPER, Funds for DCS Workshops & SIGs DAD 28.12.79
130 INVESTIGATORS, Informal visit by Panel Members to Prof Aspinall, 18.12.79. DAD 28.12.79
131 PERQ, visit to C Portman at ICL West Gorton, 17.12.79 DAD 28.12.79
132 DRAFT PANEL PAPER, The PERQ Computer. RWW 2.1.80
133 PERQ, Mtg between RL, ICL, ERCC at RL on 3.1.80. RWW 3.1.80
134 DCS FILE LIST, as at 4 January 1980. CB 4.1.80
135 FINANCE, Current Yr 79/80, ending 31.3.80. RWW 7.1.80
136 DRAFT PANEL PAPER, Use of the ICF DEC-10. RWW 8.1.80
137 DRAFT PANEL PAPER, RL Cambridge Ring Construction. RWW 8.1.80
138 DRAFT PANEL PAPER, Academic Coord's Rpt Oct 79 - Jan 80 RWW 8.1.80
139 DRAFT PANEL PAPER, UCSD Pascal. RWW 8.1.80
140 INVESTIGATORS, Visit to Sleep, UEA, 10.12.79. DAD 9.1.80
141 VISITS, Visit to PO Research Centre, Martlesham, DAD 9.1.80
142 PERQ, Briefing of Prof Rogers, 9.1.80. RWW 9.1.80
143 PERQ/EVALUATION, Questions to ask Three Rivers. RWW 10.1.80
144 PANRL MTGS, Summary of Grant Applications for PM on 24.1 DAD 11.1.80
145 RL INTERNAL DOCUMENTATION, DOC PREP STANDARD, Discussion Paper (draft 1) RWW 11.1.80
146 INVESTIGATORS, Portfolio of DCS Grants as at Sept 1979 DAD 14.1.80
147 PERQ EVALUATION, Visit to Three Rivers, USA, by R W Witty & R Rae, 14, 15 January 80 RWW 18.1.80
148 TRIP REPORT, Visit to Carnegie-Mellon University, 16 January 1980. RWW 22.1.80
149 PANEL MEETINGS, Notes on a briefing meeting at RL, on 21 January 1980. DAD 22.1.80
150 Visit by Panel members to a Review of Prof Coulouris's grant applic, 16 January 1980. DAD 23.1.80
151 PANEL PAPER, The PERQ Computer. RWW 23.1.80
152 FINANCE, Current Yr FY 79/80 ending 31.3.80. RWW 29.1.80
153 PANEL MTGS, DCS Panel Mtg 24 Jan 80 at ICE. DAD 30.1.80
154 UCSD PASCAL LICENCE, Notes on visit by John Ash of Dicoll Electronics on 1.2.80. DAD 4.2.80
155 PERQ DAD 4.2.80
156 INVESTIGATORS, Visit by Dr Snow of Newcastle University to RL on 31.1.80. DAD 4.2.80
157 UCSD PASCAL, Visit to Mr Cattanach, Contracts Swindon, 4.2.80. DAD 5.2.80
158 FINANCE, Current Yr FY 79/80, ending 31.3.80. DAD 6.2.80
159 PERQ, Notes on a telephone conversation with Robert Rae, 6.2.80. DAD 7.2.80
160 CCSC PAPER, The PERQ Computer. DAD 8.2.80
161 DCS MAILSHOT Circulation List DAD 12.2.80
162 DCS FILE LIST, as at 12.2.80. CB 12.2.80
163 UCSD PASCAL, Mtg with John Ashe, Dicoll, 12.2.80. DAD 14.2.80
164 INVESTIGATORS, Mtg with Prof Florentin, Birkbeck, 23.1.80. at UCL. DAD 14.2.80
165 INVESTIGATORS, Kirstein Monitoring Panel mtg, 23.1.80 at UCL DAD 14.2.80
166 PERQ, R Rae Trip Report. DAD 19.2.80
167 CCSC Meeting notes, 15 February 1980. DAD 19.2.80
168 UCSD PASCAL, Mtg with Peter Yeomans at RL on 18.2.80. DAD 20.2.80
169 FINANCE, Current Year FY 79/80 ending 31.3.80. DAD 25.2.80
170 FINANCE, Estimates Yr FY 80/81, ending 31.3.81 RWW 28.2.80
171 FINANCE, Estimates Yr FY 81/82, ending 31.3.82. RWW 28.2.80
172 FINANCE, FYFL for FYs 82-87. RWW 28.2.80
173 POLICY, Ideas for DCS Programme 1980-85. RWW 29.2.80
174 UCSD PASCAL, Mtg with J Brackett & P Yeomans of Softech on 3.3.80. DAD 4.3.80
175 PLANNING, RL Support Activities, Mar-Apr 1980. RWW 14.3.80
176 DCS NOTES INDEX. CB 14.3.80
177 FINANCE, Current Yr FY 79/80 ending 31.3.80. DAD 18.3.80
178 PERQ, Mtg with R Vinnicombe, ICL, 17.3.80. RWW 19.3.80
179 MEDIA COPYING MACHINE, INTERNAL USER NOTE 1, DAD Disc Formatting and Copying DAD 28.3.80
180 DCS FILE LIST, as at 31.3.80 CB 31.3.80
181 EQMT POOL, Requests for Loan of Pool Eqmt (Panel Paper Draft 1) DAD 2.4.80
182 CAMBRIDGE RING, Case for a Ring at RL (Draft 1). DAD 2.4.80
183 FINANCE, Current Yr FY 79/80.ending 31,3.80. DAD 8.4.80
184 CAMBRIDGE RING Case for Ring at RL (Draft 2). DAD 10.4.80
185 PANEL PAPER; Requests for Loan of Pool Eqmt. DAD 11.4.80
186 INVESTIGATORS, Portfolio of DCS grants, April 80. DAD 11.4.80
187 CAMBRIDGE RING ALLOCATION (Panel Paper Draft 1). DAD 11.4.80
188 PANEL MEETING PLANS, Notes on pre-meeting at Swindon, 10.4.80. DAD 11.4.80
189 PANEL PAPER, Cambridge Ring Allocation. DAD 14.4.80
190 PANEL PAPER, Portfolio of DCS Grants, April 80. DAD 14.4.80
191 Media Labelling and Logging. WS 14.4.80
192 PANEL PAPER, Requests for Loan of Pool Eqmt DAD 21.4.80
193 FINANCE, Current Yr FY 79/80 ending 31.3.80. DAD 22.4.80
194 DCS EQUIPMENT POOL, Procurement of Cambridge Rings (Draft 1). RWW 28.4.80
195 DCS EQUIPMENT POOL, Procurement of PERQs (Dft 1). RWW 28.4.80
196 DCS EQUIPMENT POOL, Procurement of PERQ-Cambridge RWW Ring interface (Draft 1). RWW 28.4.80
197 DCS EQUIPMENT POOL, Grant-Related Capital FY 80/81 (Draft 1). RWW 28.4.80
198 PANEL MEETINGS, Notes on Panel Mtg held on 24.4.80 at ICE. DAD 28.4.80
199 CCSC PAPER, DCS Eqmt Pool, Grant-Related Capital FY 80/81. DAD 6.5.80
200 CCSC PAPER, DCS Eqmt Pool, Procurement of Cambridge Rings. DAD 6.5.80