The list below gives the titles of the DCS Notes from 1 to 200.
Number | Title | Author | Date |
---|---|---|---|
1 | Visit to M/C University 24.1.78. | RWW | 30.1.78 |
2 | Visit to UMIST on 24.1.78. | RWW | 30.1.78 |
3 | Mtg with A H Bond, QMC on 17.2.78. | FRAH | 20.2.78 |
4 | Mtg with Prof Kirstein, UCL, 27.2.78. | FRAH | 28.2.78 |
5 | Visit to Prof Evans, Loughborough, 14.3.78. | FRAH | 17.3.78 |
6 | Visit to David Jenkins, Glasgow, 3.2.78. | RWW | 17.3.78 |
7 | Visit to Dr G Coulouris, QMC, 1.3.78. | FRAH | 20.3.78 |
8 | Visit to York, 24.2.78. | RWW | 20.3.78 |
9 | Visit to Cambridge, 3.3.78. | RWW | 21.3.78 |
10 | Visit to Prof Lanigan; 13.3.78. | RWW | 21.3.78 |
11 | Visit to Kent U, 13.3.78. | RWW | 21.3.78 |
12 | Mtg of Data Flow Grps & Coordinators, 15.3.78. | RWW | 21.3.78 |
13 | Visit of Dr Treleaven, Newcastle, 6.3.78. | RWW | 22.3.78 |
14 | Visit to C Hawksley, Keele U, 21.3.78. | FRAH | 28.3.78 |
15 | Visit to Dr K Bennett & Mr R Hull, Keele U, | FRAH | 28.3.78 |
16 | Visit to Mr G Egan & S Wathanasin, Manchester U | FRAH | 28.3.78 |
17 | Visit to Imperial College, 21.2.78. | GAR | 30.3.78 |
18 | Mtg with Prof Grimsdale, Sussex U, State House. | RWW | 31.3.78 |
19 | Visit to Milner & Plotkin, Edinburgh U, 5.4.78. | RWW | 6.4.78 |
20 | Visit to Warwick - Whitby-Strevens. | RWW/FRAH | 13.4.78 |
21 | Visit to Aspinall, (CYBA-M) Swansea. | RWW | 7.6.78 |
22 | Visit to Randall's Reliability Project, Newcastle. | RWW | 16.6.78 |
23 | Visit to Dr Lauer, Newcastle. | RWW | 16.6.78 |
24 | Visit to Prof Hoare, Oxford. | RWW | 22.6.78 |
25 | Mtg with Shellness, Edinburgh, at IEE, Savoy | RWW | 28.6.78 |
26 | Visit to Dr A Sloman, Sussex U, 16.8.78. | RWW | 17.8.78 |
27 | Visit to Dr G Coulouris, QMC, 29.9.78. | RWW | 3.10.78 |
28 | Rob Witty's USA Trip, 8-22 July 1978. | RWW | 18.8.78 |
29 | Visit to Prof Evans, Loughborough, 3.11.78. | RWW | 21.11.78 |
30 | Visit to Dr Paker, PCL, 24.11.78. | RWW | 30.11.78 |
31 | Visit to Prof Aspinall, UMIST. | RWW | |
32 | Visit of Dr K Bennett to RL, 27.2.79. | RWW | 2.3.79 |
33 | First Mtg of Kirstein Monitoring Panel, 28.2.79. | RWW | 7.3.79 |
34 | Mtg with Prof Grimsdale & Dr Halsall, Sussex U. | RWW | 23.3.79 |
35 | PDP11 Network Users Mtg, 14.3.79. | RWW | 30.3.79 |
36 | Visit of Mr S E Hersom, Hatfield Poly, 19.3.79. | RWW | 30.3.79 |
37 | Notes on Mtg with Dr Sheppard, Strathclyde U. | RWW | 30.3.79 |
38 | Mtg with Dr F K Hanna, Dr OR Hinton & Dr K R Dimond, Kent U, 25.3.79. | RWW | 5.4.79 |
39 | Mtg with Prof Goldsack, Dr Johnson, Dr Sloman & Mr Kramer, Imperial College, 27.4.79. | RWW | 3.5.79 |
40 | Board of Visitors to Prof R Grimsdale, Sussex U, 15.5.79. | RWW | 17.5.79 |
41 | Mtg with Prof G Coulouris, M Lamming & I Page at QMC on 23.5.79. | RWW | 17.5.79 |
42 | DCS UNIX LICENCES - V6 to V7 upgrade problem. | RWW | 15.6.79 |
43 | EMR CONTRACTS - Current Situation | RWW | 15.6.79 |
44 | SIGS & WORKSHOPS - Progress Report. | RWW | 15.6.79 |
45 | DCS MAILSHOT - Circulation List. | RWW | 15.6.79 |
46 | CURRENT FINANCIAL YEAR 79/80 ending 31.3.80. | RWW | 15.6.79 |
47 | FINANCIAL ESTIMATES FOR FY 80/81 ending 31.3.81. | RWW | 15.6.79 |
48 | DCS EQUIPMENT POOL - Current Situation | RWW | 15.6.79 |
49 | DISTRIBUTED COMPUTING NOTES - Reference List | RWW | 20.6.79 |
50 | DCS FILING SYSTEM - Reorganisation | RWW | 22.6.79 |
51 | COORDINATOR'S PROGRESS RPT (3 May - 3 July 79) | RWW | 22.6.79 |
52 | ESE INFO & COMMS SPP - Mtg with Wilde, RL, 21.6.79. | RWW | 25.6.79 |
53 | VISIT RPT - Demos Project, Dr P Wilkinson, NPL, RWW 18.6.79. | RWW | 25.6.79 |
54 | POLICY - Future DCS Policy from 1980 onwards. | RWW | 28.6.79 |
55 | PANEL MEETING - Notes on P Mtg on 3 July at IEE. | DAD | 5.7.79 |
56 | DCS FILE LIST - As at 6 July 1979 | CB | 6.7.79 |
57 | VISIT REPORT - Dr Thomas, Director, ERCC - 2.7.79 | RWW | 9.7.79 |
58 | INVESTIGATORS Bull & Sayers, Hatfield, 5.7.79 | RWW | 30.7.79 |
59 | CURRENT FINANCIAL YEAR 79/80, ending 31.3.80. | RWW | 24.7.79 |
60 | DCS FILE LIST, as at 30 July 1979. | CB | 30.7.79 |
61 | DCS NOTES REFERENCE LIST (Updated). | CB | 30.7.79 |
62 | DCS QUARTERLY PROGRESS REPORT (April - June 79) | RWW | 1.8.79 |
63 | INVESTIGATORS, Visit to Dr Osmon, Westfield,26.7.79 | DAD | 1.8.79 |
64 | DCS MAILSHOT Circulation List | RWW | 3.8.79 |
65 | EQMT POOL MGT - Outstanding Requests to Borrow | DAD | 7.8.79 |
66 | INVESTIGATORS, 2nd Mtg of Kirstein Monitoring DAD Panel, UCL, 7.8.79 | DAD | 13.8.79 |
67 | DCS FILE LIST, as at 20 August 1979. | CB | 20.8.79 |
68 | CURRENT FINANCIAL YR 79/80, ending 31.3.80 | RWW | 4.9.79 |
69 | RL SUPPORT ACTIVITIES Computing Facilities Operational Requirements | RWW | 11.9.79 |
70 | DCS FILE LIST - As at 13 Sept 79. | CB | 13.9.79 |
71 | CURRENT FINANCIAL YR 79/80, ending 31.3.80 | RWW | 19.9.79 |
72 | INVESTIGATORS, Whitby-Strevens, Technical comments on future of project. | RWW | 19.9.79 |
73 | INVESTIGATORS, Notes on a visit by Jim Cunningham, Imperial College, 4.9.79. | DAD | 11.9.79 |
74 | INVESTIGATORS, Notes on a mtg with Dr C Whitby-Strevens, Warwick, 11.9.79 | DAD | 19.9.79 |
75 | VISITS, Notes on a visit to ICL West Gorton, 12.9.79 | DAD | 19.9.79 |
76 | INVESTIGATORS, Notes on a mtg with J Gurd and I Watson, 13 Sept 79. | DAD | 20.9.79 |
77 | VISITS, Notes of a mtg with Mrs Hughes, Powell & Coleman at UMIST on 14.9.79. | DAD | 21.9.79 |
78 | VISITS, Nots on a mtg with Aspinall & Dagless of UMIST, 14.9.79. | DAD | 21.9.79 |
79 | DCS FILE LIST - as at 24 Sept 1979 | CB | 24.9.79 |
80 | PANEL PAPER - Second European Conf on Parallel & Distributed Processing. | RWW | 24.9.79 |
81 | PLANNING, RL Support Facilities | RWW | 24.9.79 |
82 | PANEL PAPER, The Demand for Unix Licences | RWW | 24.9.79 |
83 | PANEL PAPER, Requests for Loan of Pool Eqmt | DAD | 25.9.79 |
84 | PANEL PAPER, Academic Coordinator's Progress Rpt 3 July - 18 Oct 1979 | RWW | 25.9.79 |
85 | WORKSHOPS, Logica VTS ~ Cambridge Ring | RWW | 1.10.79 |
86 | FINANCE - FYFL for FY 79 / 80 | RWW | 1.10.79 |
87 | CURRENT FINANCIAL YEAR 79/80, ending 31.3.80 | RWW | 2.10.79 |
88 | FINANCE, Current Year FY 79/80, ending 31.3.80 | RWW | 3.10.79 |
89 | FINANCE, Estimates Year FY 80/81, ending 31.3.81 | RWW | 3.10.79 |
90 | FINANCE, FYFL for FYs 81-86 | RWW | 3.10.79 |
91 | RL SUPPORT, Computing Facilities, Op Requirements | RWW | 5.10.79 |
92 | DCS MAILSHOT, Circulation List | RWW | 8.10.79 |
93 | EQMT POOL MANAGEMENT, Requests for Loan of Pool Eq | DAD | 10.10.79 |
94 | EXTERNAL LINKS, ICL Proposal | RWW | 10.10.79 |
95 | PANEL PAPER, Provision of 'Cambridge Rings' via the DCS Equipment Pool. | RWW | 15.10.79 |
96 | FINANCE, Current Yr FY 79/80, ending 31.3.80 | RWW | 15.10.79 |
97 | UNIX, Visit to Kirstein at UCL and Coulouris at QMC, to discuss Unix, 17.10.79. | CP | 30.10.79 |
98 | UNIX Tech Note 1, Setting up UNIX (6th Edition) Initial Configuration. | CP | 30.10.79 |
99 | Unix Discussion Paper 1, Disk Utilisation. | CP | 30.10.79 |
100 | DCS File List, at 26 Oct 79. | CB | 26.10.79 |
101 | UNIX Tech Note 2, Systime 5000 Tech Info. | CP | 30.10.79 |
102 | Visit of Dr Osmon, Westfield, 12.11.79 | RWW | 13.11.79 |
103 | Visit to ASWE, 15 Oct 79. | DAD | 13.11.79 |
104 | Visit to Brian Randell, 25 Oct 79. Reliability project. | DAD | 13.11.79 |
105 | Visit to Peter Lauer, 25 Oct 79. | DAD | 13.11.79 |
106 | Visit to Dr P Treleaven & Prof B Randell, Data Flow project, 26 Oct 79 | DAD | 13.11.79 |
107 | Visit to Dr Mitrani, Newcastle, 26 Oct 79. | DAD | 13.11.79 |
108 | PANEL MEETING, 18 October 1979. | DAD | 14.11.79 |
109 | FINANCE, Current Year FY 79/80 ending 31.3.80 | RWW | 19.11.79 |
110 | DCS NOTES INDEX, at 19.11.79 | CB | 19.11.79 |
111 | PROGRESS REPORT, RL Annual Report 1979. | RWW | 21.11.79 |
112 | RL SUPPORT, Cambridge Ring. | RWW | 22.11.79 |
113 | INVESTIGATORS, Visit from Patterson, Glasgow, 15.11.79 | DAD | 3.12.79 |
114 | Visit to AUWE, 14.11.79. | DAD | 4.12.79 |
115 | PERQ Evaluation Exercise, Outline Plan. | RWW | 4.12.79 |
116 | FINANCE, Current Yr FY 79/80 ending 31.3.80. | RWW | 4.12.79 |
117 | DCS FILE LIST, AS AT 6 December 1979. | CB | 6.12.79 |
118 | INVESTIGATORS, Review of Hoare's grant, 5.12.79 | DAD | 7.12.79 |
119 | PERQ, Mtg with ICL, ERCC, Edinburgh 6.12.79. | RWW | 11.12.79 |
120 | VISITS, Visit to Scicon, 20.11.79. | DAD | 11.12.79 |
121 | VISITS, Further Notes on visit to Scicon, 20.11.79. | DAD | 11.12.79 |
122 | VISITS, Visit to Prof Florentin, Birkbeck, 4.12.79. | RWW | 11.12.79 |
123 | VISITS, Visit to Mr Florentin, Westfield, 4.12.79. | RWW | 11.12.79 |
124 | CAMBRIDGE RING, Mtg at Cambridge on 28.11.79. | RWW | 12.12.79 |
125 | SUPPLIERS, Visit to Dicoll on 29.11.79. | RWW | 11.12.79 |
126 | DCS MAILSHOT, Circ List | RWW | 20.12.79 |
127 | EQMT POOL, Requests for Loan of Pool Eqmt | DAD | 20.12.79 |
128 | INVESTIGATORS, Visit to Dowsing UEA, 10.12.79. | DAD | 20.12.79 |
129 | DRAFT PANEL PAPER, Funds for DCS Workshops & SIGs | DAD | 28.12.79 |
130 | INVESTIGATORS, Informal visit by Panel Members to Prof Aspinall, 18.12.79. | DAD | 28.12.79 |
131 | PERQ, visit to C Portman at ICL West Gorton, 17.12.79 | DAD | 28.12.79 |
132 | DRAFT PANEL PAPER, The PERQ Computer. | RWW | 2.1.80 |
133 | PERQ, Mtg between RL, ICL, ERCC at RL on 3.1.80. | RWW | 3.1.80 |
134 | DCS FILE LIST, as at 4 January 1980. | CB | 4.1.80 |
135 | FINANCE, Current Yr 79/80, ending 31.3.80. | RWW | 7.1.80 |
136 | DRAFT PANEL PAPER, Use of the ICF DEC-10. | RWW | 8.1.80 |
137 | DRAFT PANEL PAPER, RL Cambridge Ring Construction. | RWW | 8.1.80 |
138 | DRAFT PANEL PAPER, Academic Coord's Rpt Oct 79 - Jan 80 | RWW | 8.1.80 |
139 | DRAFT PANEL PAPER, UCSD Pascal. | RWW | 8.1.80 |
140 | INVESTIGATORS, Visit to Sleep, UEA, 10.12.79. | DAD | 9.1.80 |
141 | VISITS, Visit to PO Research Centre, Martlesham, | DAD | 9.1.80 |
142 | PERQ, Briefing of Prof Rogers, 9.1.80. | RWW | 9.1.80 |
143 | PERQ/EVALUATION, Questions to ask Three Rivers. | RWW | 10.1.80 |
144 | PANRL MTGS, Summary of Grant Applications for PM on 24.1 | DAD | 11.1.80 |
145 | RL INTERNAL DOCUMENTATION, DOC PREP STANDARD, Discussion Paper (draft 1) | RWW | 11.1.80 |
146 | INVESTIGATORS, Portfolio of DCS Grants as at Sept 1979 | DAD | 14.1.80 |
147 | PERQ EVALUATION, Visit to Three Rivers, USA, by R W Witty & R Rae, 14, 15 January 80 | RWW | 18.1.80 |
148 | TRIP REPORT, Visit to Carnegie-Mellon University, 16 January 1980. | RWW | 22.1.80 |
149 | PANEL MEETINGS, Notes on a briefing meeting at RL, on 21 January 1980. | DAD | 22.1.80 |
150 | Visit by Panel members to a Review of Prof Coulouris's grant applic, 16 January 1980. | DAD | 23.1.80 |
151 | PANEL PAPER, The PERQ Computer. | RWW | 23.1.80 |
152 | FINANCE, Current Yr FY 79/80 ending 31.3.80. | RWW | 29.1.80 |
153 | PANEL MTGS, DCS Panel Mtg 24 Jan 80 at ICE. | DAD | 30.1.80 |
154 | UCSD PASCAL LICENCE, Notes on visit by John Ash of Dicoll Electronics on 1.2.80. | DAD | 4.2.80 |
155 | PERQ | DAD | 4.2.80 |
156 | INVESTIGATORS, Visit by Dr Snow of Newcastle University to RL on 31.1.80. | DAD | 4.2.80 |
157 | UCSD PASCAL, Visit to Mr Cattanach, Contracts Swindon, 4.2.80. | DAD | 5.2.80 |
158 | FINANCE, Current Yr FY 79/80, ending 31.3.80. | DAD | 6.2.80 |
159 | PERQ, Notes on a telephone conversation with Robert Rae, 6.2.80. | DAD | 7.2.80 |
160 | CCSC PAPER, The PERQ Computer. | DAD | 8.2.80 |
161 | DCS MAILSHOT Circulation List | DAD | 12.2.80 |
162 | DCS FILE LIST, as at 12.2.80. | CB | 12.2.80 |
163 | UCSD PASCAL, Mtg with John Ashe, Dicoll, 12.2.80. | DAD | 14.2.80 |
164 | INVESTIGATORS, Mtg with Prof Florentin, Birkbeck, 23.1.80. at UCL. | DAD | 14.2.80 |
165 | INVESTIGATORS, Kirstein Monitoring Panel mtg, 23.1.80 at UCL | DAD | 14.2.80 |
166 | PERQ, R Rae Trip Report. | DAD | 19.2.80 |
167 | CCSC Meeting notes, 15 February 1980. | DAD | 19.2.80 |
168 | UCSD PASCAL, Mtg with Peter Yeomans at RL on 18.2.80. | DAD | 20.2.80 |
169 | FINANCE, Current Year FY 79/80 ending 31.3.80. | DAD | 25.2.80 |
170 | FINANCE, Estimates Yr FY 80/81, ending 31.3.81 | RWW | 28.2.80 |
171 | FINANCE, Estimates Yr FY 81/82, ending 31.3.82. | RWW | 28.2.80 |
172 | FINANCE, FYFL for FYs 82-87. | RWW | 28.2.80 |
173 | POLICY, Ideas for DCS Programme 1980-85. | RWW | 29.2.80 |
174 | UCSD PASCAL, Mtg with J Brackett & P Yeomans of Softech on 3.3.80. | DAD | 4.3.80 |
175 | PLANNING, RL Support Activities, Mar-Apr 1980. | RWW | 14.3.80 |
176 | DCS NOTES INDEX. | CB | 14.3.80 |
177 | FINANCE, Current Yr FY 79/80 ending 31.3.80. | DAD | 18.3.80 |
178 | PERQ, Mtg with R Vinnicombe, ICL, 17.3.80. | RWW | 19.3.80 |
179 | MEDIA COPYING MACHINE, INTERNAL USER NOTE 1, DAD Disc Formatting and Copying | DAD | 28.3.80 |
180 | DCS FILE LIST, as at 31.3.80 | CB | 31.3.80 |
181 | EQMT POOL, Requests for Loan of Pool Eqmt (Panel Paper Draft 1) | DAD | 2.4.80 |
182 | CAMBRIDGE RING, Case for a Ring at RL (Draft 1). | DAD | 2.4.80 |
183 | FINANCE, Current Yr FY 79/80.ending 31,3.80. | DAD | 8.4.80 |
184 | CAMBRIDGE RING Case for Ring at RL (Draft 2). | DAD | 10.4.80 |
185 | PANEL PAPER; Requests for Loan of Pool Eqmt. | DAD | 11.4.80 |
186 | INVESTIGATORS, Portfolio of DCS grants, April 80. | DAD | 11.4.80 |
187 | CAMBRIDGE RING ALLOCATION (Panel Paper Draft 1). | DAD | 11.4.80 |
188 | PANEL MEETING PLANS, Notes on pre-meeting at Swindon, 10.4.80. | DAD | 11.4.80 |
189 | PANEL PAPER, Cambridge Ring Allocation. | DAD | 14.4.80 |
190 | PANEL PAPER, Portfolio of DCS Grants, April 80. | DAD | 14.4.80 |
191 | Media Labelling and Logging. | WS | 14.4.80 |
192 | PANEL PAPER, Requests for Loan of Pool Eqmt | DAD | 21.4.80 |
193 | FINANCE, Current Yr FY 79/80 ending 31.3.80. | DAD | 22.4.80 |
194 | DCS EQUIPMENT POOL, Procurement of Cambridge Rings (Draft 1). | RWW | 28.4.80 |
195 | DCS EQUIPMENT POOL, Procurement of PERQs (Dft 1). | RWW | 28.4.80 |
196 | DCS EQUIPMENT POOL, Procurement of PERQ-Cambridge RWW Ring interface (Draft 1). | RWW | 28.4.80 |
197 | DCS EQUIPMENT POOL, Grant-Related Capital FY 80/81 (Draft 1). | RWW | 28.4.80 |
198 | PANEL MEETINGS, Notes on Panel Mtg held on 24.4.80 at ICE. | DAD | 28.4.80 |
199 | CCSC PAPER, DCS Eqmt Pool, Grant-Related Capital FY 80/81. | DAD | 6.5.80 |
200 | CCSC PAPER, DCS Eqmt Pool, Procurement of Cambridge Rings. | DAD | 6.5.80 |