Contact us Heritage collections Image license terms
HOME Literature Facilities
Further reading □ NIRNS □ The beginning of NIRNS □ NIRNS Charter □ Committee papers □ SRC/SERC □ Committee papers □ Council publications □ Rutherford Laboratory □ Laboratory Meetings □ Evolution of site □ Architects drawings and artwork □ Brochures and annual reports □ Technical publications □ Newsletters □ 'Bulletin' newsletter □ Open days □ Photograph albums and slides
Contact us Heritage archives Image license terms

Search

    RUTHERFORD APPLETON LABORATORY
⟶ RAL ⟶ Literature
RUTHERFORD APPLETON LABORATORY
⟶ RAL ⟶ Literature
Further reading ⇓

NIRNS
□ The beginning of NIRNS
□ NIRNS Charter
□ Committee papers
SRC/SERC
□ Committee papers
□ Council publications
Rutherford Laboratory
□ Laboratory Meetings
□ Evolution of site
□ Architects drawings and artwork
□ Brochures and annual reports
□ Technical publications
□ Newsletters
□ 'Bulletin' newsletter
□ Open days
□ Photograph albums and slides

Laboratory Meetings

Director's Meeting: Terms of Reference
1962
Director's Meeting (22 November 1962)
1963
Director's Meeting (15 March 1963) Director's Meeting (16 April 1963 at Liverpool) Director's Meeting (12 June 1963 at Liverpool) Director's Meeting (22 July 1963 at Chilton) Director's Meeting (13 September 1963 at Liverpool) Director's Meeting (14 October 1963 at RL) Director's Meeting (7 November 1963)
1964
Notes for the Chairman Director's Meeting (9 January 1964 at Chilton) Director's Meeting (19 February 1964 at DSIR, London) Director's Meeting (18 March 1964 at Chilton) Director's Meeting (8 April 1964 at DL) Director's Meeting (20 May 1964 at DL) Director's Meeting (17 June 1964 at RL) Director's Meeting (29 July 1964 at DL) Director's Meeting (9 September 1964 at RL) Director's Meeting (17 September 1964) Director's Meeting (1 October 1964 at DL) Director's Meeting (30 October 1964 at RL) Director's Meeting (9 December 1964)
1965
Director's Meeting (14 January 1965) Director's Meeting (11 March 1965) Director's Meeting (7 April 1965)

PPC6(76) The Future High Energy Physics Programme at Nimrod (Discussion paper by Godfrey Stafford, 6 January 1976)

Pages of Minor Works Orders (MWO) have been omitted from all but a couple of papers. Papers which consist entirely of MWO have been omitted altogether including: 73, 74, 80, 81, 83, 87, 92, 94, 96, 98, 99 (3 January 1963), 102 (3 February 1963), 104 (1 March 1963), 106 (29 March 1963), 109 (3 May 1963), 110 (31 May 1963), 114 (29 August 1963), 115 (4 October 1963), 116 (1 November 1963), 117 (Work against accommodation: Nil, 1 November 1963), 118 (2 December 1963), 119 (2 December 1963).

1959
RLBC/P1 Approval and control of expenditure for capital building schemes (July 1959) RLBC/P3 and NI(GP)(59)36 Rutherford Laboratory non-industrial staff accommodation (14 October 1959) RLBC/P4 and NI(GP)(59)42 Building and auxiliary maintenance services (14 October 1959) RLBC/P5 Proposed extension to Building 412 (1959) RLBC/P6 Alternative access road (1959) RLBC/P7 North car park (8 December 1959)
1960
RLBC/P8 Inflammable Store (January 1960) RLBC/P9 Statement of MWOs to 2.2.60 (2 February 1960) RLBC/P10 Boundary fence (2 February 1960) RLBC/P12 Steam supplies (12 February 1960) RLBC/P13 Control Room extension (5 April 1960) RLBC/P14 Orion computer building (1960) RLBC/P15 Heavy Liquid Bubble Chamber Annexe (requirements and estimated cost of 46,000 pounds, 1960) RLBC/P19 Note by TG Pickavance: Laboratory canteen (4 May 1960) RLBC/P20 Rutherford Laboratory Site Services: Additional roads, car parks and fences (28 April 1960) RLBC/P21 Extension to the PLA building (4 May 1960) RLBC/P22 Garages (for site buses, the official car service, general transport of goods and special purpose vehicles, 10 May 1960) RLBC/P23 Minor Works Orders (15 June 1960) RLBC/P28 Street lighting (24 August 1960) RLBC/P31 Minor Works Orders to 25.10.60 (25 October 1960)
1961
RLBC/P32 Accommodation for Nimrod operations staff: Extension to Building R2 (4 January 1961) RLBC/P33 Plant Store (undated) RLBC/P36 Temporary Terrapin office accommodation (27 January 1961) RLBC/P43 Rutherford Laboratory Site Services: Medium Voltage Supplies (9 February 1961) RLBC/P44 Building R9 Engineering Workshop: Proposed additional mezzanine floor (22 February 1961) RLBC/P47 Plant Store for the Rutherford Laboratory (War Department is closing Didcot Depot so alternate storage facilities are required to house spares for PLA and Nimrod; estimated cost is 42,000 pounds; approval is sought. [This became R24] 28 March 1961) RLBC/P50 NI/GP/61/21 Centralised water cooling scheme for Buildings R1, R2 and R8 (23 March 1961) RLBC/P51 NI/GP/61/24 Extension to Nimrod Control Room (Proposal for extension costing 14,375 pounds, 30 March 1961) RLBC/P52 NI/GP/61/25 Development of Parasitic Area at Nimrod (Need for a second experimental area with associated beam transport equipment at estimated cost of 334,000 pounds, notes by W Galbraith and TG Pickavance, 5 April 1961) RLBC/P53 NI/GP/61/26 Roofing-in of hard-standing adjacent to the main Experimental Area (Estimated cost 71,500 pounds, 5 April 1961) RLBC/P55 Landscaping of spoil heap at Rutherford Laboratory (options and costs, undated, context indicates April 1961) RLBC/P59 Additional steel flooring for storage space (R24 is to be used for permanent spare plant; two concrete cells are to be installed in the Experimental Area for the storage of day-to-day equipment at an estimated cost of 1,600 pounds (9 August 1961) RLBC/P60 Temporary accommodation for Contract Labour (Proposal for a temporary building from Blacknell Buildings east of R9 at 70 pounds a month, 1 August 1961) RLBC/P61 Services Building (Proposal for accommodation for 70 contract industrials possibly in south-west corner of Roads 4 and 6, 11 August 1961) RLBC/P65 Site Power Distribution (Further capacity required to prevent overloading, lists of kVA loading, September 1961) RLBC/P66 Accommodation requirements for Industrial Chemistry Department staff at NIRNS (Chemical services, analysis of samples at B447 or H10, 4 October 1961) RLBC/P68 Stores unloading bay (Proposal for a covered area adjacent to Stores in R1, 6 October 1961) RLBC/P69 Housing for Collapsible Container (Handling of vapour during emergency disposal of propane or freon from Bubble Chamber, 3 November 1961) RLBC/P70 Minor Works Orders (2 November 1961) RLBC/P71 Minor Works Orders (1 December 1961) RLBC/P72 Proposed extension to Building R18 Ancillary Workshop (Additional office and workshop space for Industrial Chemistry Group, Safety Group, Welfare Office, Transport Group, Groundsman's Store and Metrology Laboratory; includes plan pf two-storey extension, 29 December 1961)
1962
RLBC/P75 Proposed extension to R18: Ancillary Workshop (undated) RLBC/P76 Road construction (problems with concrete slab roads such as poor joints, ponding, kerbs cannot be lowered, freeze in icy conditions, sun glare during summer, 1 February 1962) RLBC/P77 Site electrical power distribution (February 1962) RLBC/P79 Building signs (Letter from RM Snadden, Senior Architect, Winfrith to D Harrison, R1: ID numbers will be pressed metal stove enamelled at 3 pounds each plus fixing, building signs will be Perspex letters on Perspex screen in a hardwood surround at 7 pounds each, directions signs will be similar to building signs but on steel posts, 31 January 1962) RLBC/P82 Road to Laboratories on north side of R1 extension (permanent road justified due to university users, 30 March 1962) RLBC/P84 Proposed extension to R9 (changes to use of part of the building, 3 May 1962) RLBC/P85 Heavy Duty Laboratory: Additional Electrical Services (3 May 1962) RLBC/P88 EHT Power Supply: Sub-station no. 14 (31 May 1962) RLBC/P89 Heavy Duty Laboratory: Cooling Water Installation (Additional demineralised cooling water system for experimental equipment, 31 May 1962) RLBC/P91 Proposed extension to Road 8 to serve south end of R24 Plant Store (July 1962) RLBC/P95 Extension to R8 (Sketch showing proposed layout for mess room, male and female toilets and locker room, 27 September 1962) RLBC/P97 Additional MV Switchboard in Sub-Station No.12 including additional transformer capacity and outgoing feeders (2 November 1962)
1963
RLBC/P100 Hydrogen target ventilation scheme for Nimrod Experimental Hall (January 1963) RLBC/P101 DC Power Supplies for VEC Ion Source test magnet in Heavy Lab R25 (undated) RLBC/P103 Proposed Mercury Plant Maintenance Building (refers to letter from Choate on same date, 28 February 1963) RLBC/P105 Note from Choate, SWO to Goode concerning Heavy Plant Store (includes estimates of costs and location, 26 March 1963) RLBC/P107 Low Background Laboratory for Radiation Protection Group (to be housed in an R20 basement/cave; includes explanatory note with cost estimates, 2 April 1963) RLBC/P108 Proposed link road from Nimrod Experimental Hall to Parasitic Area and Tunnel 8 (undated) RLBC/P111 Site electrical power distribution reinforcement of Substation 13: Modified version (includes costings; see also note from Bowles 9 May 1963, 30 April 1963)

1959
RLBC/M1 (22 July 1959) RLBC/M2 (12 August 1959) RLBC/M3 (10 September 1959) RLBC/M4 Special meeting (30 September 1959) RLBC/M5 (7 October 1959) RLBC/M6 (3 November 1959) RLBC/M7 (5 November 1959) RLBC/M8 (3 December 1959) RLBC/M9 (9 December 1959) RLBC/M10 Phase II buildings (17 December 1959)
1960
RLBC/M11 (7 January 1960) RLBC/M12 (4 February 1960) RLBC/M13 (3 March 1960) RLBC/M14 (8 April 1960) RLBC/M15 (12 May 1960) RLBC/M16 (16 June 1960) RLBC/M17 Special meeting: Cable trench for counting cables (24 June 1960) RLBC/M18 Index of costs has increased from 100 in 1949 to 180 in 1960, storage of lawn mowers, siting of temporary office accommodation (14 July 1960) RLBC/M19 (Includes list of MWO, 11 August 1960) RLBC/M20 Boundary fence not yet installed to be 4-foot 6-inches (8 September 1960) RLBC/M21 Special meeting: New Arcon extension (28 September 1960) RLBC/M22 (6 October 1960) RLBC/M23 Decision to use existing runway as foundation for the main access road; need for property fence 4-foot high (3 November 1960) RLBC/M23b Chain link fencing, chalk spoil landscaping (Possibly a special meeting, 14 November 1960) RLBC/M24 (1 December 1960)
1961
RLBC/M25 (16 January 1961) RLBC/M26 Temporary office accommodation, surface water drainage scheme, gas an water mains and the need to excavate through rock, clearance of spoil, R2 extension, heavy duty laboratory block, new office block, electricity proposals, plant store (31 January 1961) RLBC/M27 Medium voltage supplies, mezzanine floor on Engineering Workshop, additional roads, car parks, drains and street lighting, heavy duty laboratory and office block (7 March 1961) RLBC/M28 Car parks and roads, plant store (11 April 1961) RLBC/M29 Acoustics and ventilation of Conference Room, PLA Radiochemical Laboratory and surrounding land, bad parking of cars, fire alarm system, klaxons, cycle shelter (9 May 1961) RLBC/M30 PLA extension, site clearance and flower beds, cycle shelters, acoustics for Lecture Theatre, new computer building is NIRNS responsibility, negotiation with CEGB for two further substations (6 June 1961) RLBC/M31 Fire Committee recommendations, PLA extension, layout of grounds, urgent action on spoil heap as Jellicoe has been kept waiting (11 July 1961) RLBC/M31A Housing for DC Link Board and incorrect charge code, ancillary maintenance building and lack of re-estimation of costs, need to monitor costs (Draft, special meeting, 26 July 1961) RLBC/M32 Proposal for general layout of site grounds, Jellico asked to produce a scheme costing less than 15,000 pounds, CEGB working on design of new substation, misunderstanding over building numbers, temporary accommodation for contract labour, Bowles concerned at lack of progress on site fencing and car parks (15 August 1963) RLBC/M33 Layout of grounds and issues with deep-rooted trees, concrete runway adjacent to Fermi Avenue cannot be used as Contractors Area because of radiation hazard from PLA, costs for ventilation plant in Radiochemical Laboratory have increased significantly over estimate (12 September 1961) RLBC/M34 Accommodation for Industrial Chemistry Staff as R25 is unsuitable; site power distribution; Atlas computer building costs have increased since estimate so 220,000 pounds is now 250,000 pounds, Treasury will not approve this so a meeting to be arranged with Ferranti; layout of grounds including fencing and holes to be dug in concrete for non-resinous trees with parking between; many tenders received have increased by 15 percent over the last six months; tenders for Restaurant were up by 10,000 pounds as external services are much more involved than anticipated, 10 October 1961) RLBC/M35 Accommodation for Industrial Chemistry Staff; site power distribution; PLA extension over budget; huts for maintenance contractors; Atlas computer building costs agreed; vapour receiver building agreed; many changes to Restaurant work (6 November 1961) RLBC/M36 Accommodation for Industrial Chemistry Staff; layout of grounds and the final arrangement of gates; estimate for PLA extension; Atlas computer building and re-examination of costs; clearance of area around R13 and R14 and the siting of car parks; lack of progress on site clearance; equipment in the Restaurant; bus shelters; design of signs on buildings; delays in preliminary designs and estimates causing issues for Chivers who would be compelled to reduce their workforce by Easter 1962; Minor Works Orders budget now spent; future meetings of RLBC will change; Minutes actually number these as M35, 5 December 1961)
1962
RLBC/M37 Atlas Computer Building estimates, extension to R18 but concerns over height of building, pruning down of PLA extension, clearance around R13 and R14, layout of grounds, site power distribution, Experimental Area extension, bus shelters, signs to be based on scheme at Winfrith on upper corners of buildings, new estimate for Lecture Theatre, 1 January 1962) RLBC/M38 Extension to R18 requires additional work, estimate for Atlas Computer building R27, site power distribution, resurfacing of roads and issue of ponding, extension to PLA, estimate for extension to R2 including additional costs due to difficult working conditions and discovery of pre-existing services, roads and roundabouts opposite R27, parasitic area extension, experimental area extension, Plant Store; includes note with update from Howlett, 5 February 1962) RLBC/M39 Atlas building and issues with ventilation; wind and cold had delayed the PLA extension; Mezzanine floor in R8; tender for work reshaping spoil heap accepted plus 1000 pounds to cover Jellicoe expenditure so final cost of project is 19,500 pounds  plus 4,000 for seeding; site power distribution; R2 extension; roads and roundabouts with cats eyes down the centre line; access to labs on north side of R1; preliminary estimate for Lecture Theatre is reduced to 80,000 pounds; Plant Store R24 now working out at 2.7 pounds per foot; standard signs for buildings, roads and car parks in Perspex or stove-enamelled steel such as they have at Bracknell; R1 extension Orion bay (5 March 1962) RLBC/M40 Issues with access road to R1 laboratories; Atlas Computer building ready for submission to Treasury; progress on the PLA extension; tender received from Shephard-Hills to reshape spoil heap but insufficient capacity to sow grass; insufficient rain to determine any ponding issues on roads; contractor started work on R2 extension; AERE policeman required to control traffic at Fermi Avenue and Road 7 during evening outmuster; Lecture Theatre redesign to come within 80,000 pound estimate so two schemes can be presented to Lord Bridges: minimum cost and economical but functionally more refined; estimates sought for building signs; too much time has elapsed since tenders for Restaurant were drawn up to now have to be redone (2 April 1962) RLBC/M41 R2 extension shortage of carpenters due to closure of Chivers Labour Camp at Chilton; building signs approved but new design of entrance signs requested from next lowest tender; siting of site power supply CEGB substation; P84 extension to workshop area proposal satisfactory but a more elaborate scheme may be desirable to improve the aesthetics of the east elevation of R9, no provision for female drivers although this is not envisaged at this point; case for additional water cooling scheme for R25; Shephard-Hill asked for additional quote to cover dumping all surplus spoil from the runways into the heart of the mound; restart of design of Restaurant has been approved; design for Lecture Theatre first mooted in 7.1.60 but no final decision because estimate too high so seating reduced to 200 and new design to be discussed with Beechams (7 May 1962) RLBC/M42 Lecture Theatre plans revised, putting main entrance on the ground floor and plant room under the seating so estimated cost is now 42,000 pounds; Treasury approval received for Restaurant; package deal on Plant Store R24 not aesthetically good, produced no saving of effort; cooling water scheme for R25 reduced from 2Mw to 1Mw to reduce costs; building signs discussed and preference was for black or dark grey background; consideration of costs of various road and car park surface treatments; R1 car park to be extended to the north by 30 feet, but more parking will be needed in the future (4 June 1962) RLBC/M43 Construction of Restaurant should recommence on 15 August for completion by May 1963; drawings of Lecture Theatre for tendering purposes approved, provision of lavatories meets requirements of London Building Act; fees for plant store R24 increased slightly due to difficulties with external services; approval for R25 cooling water scheme now with Treasury; unsatisfactory steel framework for plant storage space in Experimental Area; proposal to use space between R8 and R10 for toilets, locker room and mess room for laboratory workers (2 July 1962) RLBC/M44 Tenders for Restaurant due the next day, construction to restart on 15 August; sketch for Lecture Theatre prepared and tenders will be invited on a package deal basis, concerns that such a basic design should not appear too austere; discussion of specimen signs in various colour combinations and agreement on black characters on a grey background with raised grey surround, to be erected on all buildings; sketches for site main entrance (30 July 1962) RLBC/M45 Tenders received for Restaurant up 20 percent on original offers; Lecture Theatre plans submitted; changes to plan for extension to R18 to accommodate Industrial Chemistry and Electronics Sections; simple building to replace watchman's hut at site main entrance; plans for future requirements for offices and laboratories; discussion of repairs to R20 car park (3 September 1962) RLBC/M46 Modifications to roof of R24 which leaked during heavy rain; work on Restaurant has restarted, needs to be kept on-budget; working drawings of Lecture Theatre complete and will be put out to tender; phase I extension to R18 approved, no accommodation provided for transport section even though a separate building would be more expensive because of the shielding required against the PLA; provision of male toilets, mess room and locker room in the space between R8 and R10 agreed; sketch of site main entrance with police hut on the right upon entering rather than left; plans for siting of new Electronics Laboratories (1 October 1962) RLBC/M47 Construction of Restaurant proceeding, roof sections to be placed as soon as possible to permit internal work; tenders invited for Lecture Theatre; revised plan for site main entrance at cost of 2,000 pounds, lorry lay-by to the considered; delay on building signs; proposed new laboratory and office building R33 may require purchase of additional land so discussion of alternative sites so as to minimise transit distance from R1; water cooling towers R11 should have some colouring applied to improve appearance; discussion of fees for SWO non-productive design work; in 2.5 years of operation SWO had completed MWO to the value of 14,000 pounds (5 November 1962) RLBC/M48 Restaurant kitchen equipment is progressing; four tenders received for Lecture Theatre, lowest is Chivers at 49,000 pounds though this is slightly above the project estimate due to the recent pay award, construction to begin 2 January 1962 and completed by 31 October 1963, Chivers warned that new labour must be employed for this rather than by robbing other projects; water cooling towers to be surface dressed; fees for non-productive design work should be written, but Bowles regretted circumstances from which they had arisen; substation 14 capital costs to be met by CEGB but RL will need to provide drainage and cold water services; R2 extension work has fallen behind with no possibility of recouping it (3 December 1962)
1963
RLBC/M49 Building work stopped de to snow and severe frost; issues installing telephones in new offices so plan to train craftsmen as telephone engineers (14 January 1963) RLBC/M50 Acoustics in Lecture Theatre; DC power supplies for R25; alternative sitings of R33 now determined south of R25; aesthetics of meter chamber near north-east gate; number of on-site GPO increased (4 February 1963) RLBC/M51 Adjustments to Lecture Theatre acoustics plan; cooling water plant for R25; DC supplies for R25; Electronics Lab and office block R33, issues of transfer of land from AERE; Steam meter chamber; Mercury maintenance block; Experimental Area extension; aesthetic appearance of water cooling towers R11 (4 March 1963) RLBC/M52 Link road from Experimental Hall to Parasitic Area and Tunnel 8 requires some minor demolition which would incur cost so consider further; Heavy Plant Store and possibility to lease a storage shed at Didcot; Low Background Lab for Radiation Protection to become part of R20 (1 April 1963) RLBC/M53 Link road from Experimental Hall to Parasitic Area reconsidered, issues with the number of toilets, could be folded into other excavations; siting of Heavy Plant Store R40 in relation to R25 to look neat; adjustments to Low Background Lab; estimates for Helium Bubble Chamber seem very hight at 8,500 pounds; proposed access tunnel to Injector Room R5 requires drilling through 4 foot of concrete; tunnel to Magnet Room required to move equipment when Nimrod is operational; Irradiation Building needed for calibration of instruments as present open air area near R20 undesirable in inclement weather, could they use a plastic building?; Ancient well near west end of R20 needs permanent treatment (6 May 1963) RLBC/M54 Link road from Experimental Area to Parasitic Area; Heavy Plant Store location; transfer of land for R33; estimate for Helium Bubble Chamber building; preservation of ancient well; enlargement of Chilton Pond (10 June 1963) RLBC/M54S Special meeting to discuss building budget (some projects deferred/low priority; reduction of AERE clerical support staff which incur 140 percent overhead and construction staff on site, 1 July 1963) RLBC/M55 Changing pattern of industrial prices and wages has resulted in projects becoming costing more than was budgeted so some were suspended; Helium Bubble Chamber plant building work also suspended; siting of Irradiation building agreed south-west of R33 but in abeyance for now (17 July 1963) RLBC/M56 If new entrance to magnet room is approved then Tunnel 8 will not be required; Hydrogen Target Building cold utilise some spoil for mounding; some jobs can proceed including Gatekeepers Lodge and seeding Nimrod area; overall 33 percent reduction in labour resulting from slow-down in labour (sample building progress sheets included, 2 September 1963) RLBC/M57 Link road to R5 and R6 estimate not ready although lavatory block becoming urgent requirement; Lecture Theatre needs to be ready for use at official opening of the Lab so tests of ventilation, acoustics, lighting etc must be done before then, scheme to incorporate a mural put before Governing Board; R2 extension three-storey section will complete slightly early, and hopes that there will be no flooring troubles as there were in R22 which might have been due to wet screed and damage to the lino; this was the last meeting attended by Geoffrey Dixon who was leaving to set up in private practice (7 October 1963) RLBC/M58 Reduction in committee work as a consequence of the continued deferment of new projects; Link road to R5 and R6 lavatory block estimate confirmed at 3,700 pounds, existing temporary lavatory preventing completion of banking work; Lecture Theatre work being paid very close attention; remedial work on floor of the foyer and rotunda in R22 Restaurant to be discussed later that day; multitude of contractor's huts even though projects completed was unsightly (4 November 1963)

See also: Chief Engineer Percy Bowles' correspondence

Minutes of meeting (8 January 1962) RLBC/C2 Minutes of meeting (5 February 1962) Note from J Johnson, SWO concerning Chilton Pond Drainage (includes sketch showing location of Ponds no.1 and no.3, 21 March 1962) Note from Bowles to Johnson, SWO concerning Chilton Pond Drainage and suggesting two reports per year (26 March 1962) RLBC/C3 Minutes of meeting (30 March 1962) RLBC/C4 Minutes of meeting (25 May 1962) Note cancelling meetings until further notice (24 July 1962)

PSPC/A1 2:15 9 July 1957 in the Conference Room, Cockcroft Hall
PSPC/A2 12:00 30 July 1957 in the Conference Room, B364
PSPC/A3 Not found
PSPC/A4 10:30 3 September 1957 in Room 627, St Giles Court, London
PSPC/A5 9:15 16 October 1957 in the Conference Room, B364 (Health Physics) (Papers: PSPC/P3, 4)
PSPC/A6 10:30 27 November 1957 in the Conference Room, B424 (Papers: NI-GP-57/3, 4, 6, 5, 7, 8)
PSPC/A7 9:15 17 January 1958 in the Conference Room, Cockcroft Hall
PSPC/A8 2:15 11 February 1958 in the Conference Room, Cockcroft Hall
PSPC/A9 2:15 27 March 1958 in the Conference Room, Cockcroft Hall
PSPC/A10 1:30 22 May 1958 in the Conference Room, Cockcroft Hall
PSPC/A11 2:15 18 July 1958 in the Conference Room, Cockcroft Hall (Papers: PSPC/P19, 20)
PSPC/A12 2:15 24 September 1958 in Dr Pickavance's office, Room 22, B412
PSPC/A13 2:15 13 November 1958 in Dr Pickavance's office, Room 22, B412
PSPC/A14 Not found
PSPC/A15 1:15 19 March 1959 in Dr Pickavance's office, Room 22, B412
PSPC/A16 9:15 3 June 1959 in Dr Pickavance's office, Room 22, B412 (Papers: PSPC/P43, 44, 48, 40, 41, 45)
PSPC/A17 2:15 24 September 1959 in Dr Pickavance's office, Room 22, B412 (Papers: PSPC/P53, 52)
PSPC/A18 2:15 22 December 1959 in the Conference Room, B470.1 at Rutherford Laboratory, Harwell
PSPC/A19 2:15 25 March 1960 in the Conference Room, B470.1 at Rutherford Laboratory, Harwell
PSPC/A20 2:15 20 July 1960 in the Conference Room, B470.1 (Papers: PSPC/P60, 65, 66, 67, 69, 68, 70, 72, 71)
PSPC/A21 2:15 2 November 1960 in the Conference Room, R1, RHEL (Papers: PSPC/P73, 74, 75, 76, 77)
PSPC/A22 2:15 25 January 1961 in Dr Pickavance's office, Room 1.7, R1 (Papers: PSPC/P79)
PSPC/A23 2:15 11 April 1961 in the Conference Room, R1 (Papers: PSPC/P83)
PSPC/A24 2:15 27 June 1961 in Dr Pickavance's office, Room 1.7, R1 (Papers: PSPC/P85, 86, 87)
PSPC/A26 2:25 16 November 1961 in the Conference Room, R1 (Papers: PSPC/P92, 90, 91, 93)

Many papers were discussed both at NIRNS General Purposes Committee and Proton Synchrotron Project Committee meetings.

1957
PSPC/SC1 Minutes of PSPC Sub-Committee (To discuss preparation for GPC of Quarterly Statement, 7 November 1957) PSPC/SC2 Minutes of PSPC Sub-Committee (To discuss draft reports for GPC on PS project, 5 November 1957)
1958
PSPC/P15 also NI(GP)(58)7 Increased estimate/Quarterly summary of cost of Main Building for the 7 GeV Proton Synchrotron (Revised estimates paper by GW Dixon, 15 May 1958) PSPC/P20 also NI(GP)(58)11 Magnet Power Supply (Proposal, costs and sketch, note from Percy Bowles, July 1958) PSPC/P21 The vacuum chamber for the 7PS (Discussion of design considerations and comparison with Saclay and Cosmotron, 15 July 1958) PSPC/P26 Provision of general mechanical engineering day-work labour and supervision to assist in the construction and commissioning of the 7PS (4 November 1958) PSPC/P27 and NI(GP)(58)21 Summary of negotiation with the English Electric Co. on the contractual price for the Rotary Plant for the Magnet Power Supply (14 November 1958) PSPC/P28 Engineering Staff Complement (Recommendation for an increase in staffing level from 55 to 65, 11 November 1958) PSPC/P29 Re-assessment of the Master Programme (Includes task planning diagram, 11 November 1958) PSPC/P30 Magnet Coils (Assessment of contracts, 13 November 1958) PSPC/P31 Section through vacuum vessel (Drawing only, undated) PSPC/P32 and NI(GP)(58)23 Vacuum equipment for the Injector (Tenders and proposal, 1 December 1958)
1959
PSPC/P33 and NI(GP)(59)1 Design and manufacture of the main vacuum chamber (9 January 1959) PSPC/P34 Plant construction (Issues concerning the master programme, work inside the cave and metrology, 16, January 1959) PSPC/P35 Proposed extension to Preparation Area (Plans for accommodating test rigs, January 1959) PSPC/P36 Re-assessment of the Construction Programme (Comments on the programme and assessment of contract delivery dates, 21 January 1959) PSPC/P37 also NI-GP-59-2 Quarterly update no.6 (22 January 1959) PSPC/P41 and NI(GP)(59)18 Electrical Distribution Switchgear for the Rutherford Laboratories (Pulsating nature of the load has necessitated separate feed from the Grid, other circuits needed following more detailed specifications, 10 June 1959) PSPC/P43 Magnet Sectors: Build-up plates (Redesign of the magnet sectors requires 0.25 inch decrease in their thickness to allow for added insulation, 1 June 1959) PSPC/P44 Magnet coil developments (Increase in costs at MetroVick due to manufacture of specialist tools, connectors and transport cradles, 29 May 1959) PSPC/P46 and NI(GP)(59)26 Main pole pieces for Nimrod (Tenders received, discussion, amended costs, recommendation to accept English Electric at a fixed cost of 226,959 pounds, 20 July 1959) PSPC/P47 and NI(GP)(59)45 Additional work on Nimrod magnet sectors (Increased costs due to necessary modifications by Sankeys, 14 October 1959) PSPC/P48 Tender summary for electrical installation work Contract CON/HAR/3A3495 (Firms tendering plus discussion, recommendation to accept FH Wheeler Ltd, 20 May 1959) PSPC/P49 and NI(GP)(59)19  The main surface water drainage scheme for the Proton Synchrotron area of the Rutherford Laboratory (Revision of scheme following long-term observations of soakaways, consultation with Met Office and Merz and McLellan; includes plan of two possible routes, 11 June 1959) PSPC/P50 and NI(GP)(59)18b Proposed contracts for approval (Drift tube assemblies, BO Morris, 55,703 pounds; hydrogen compressors, Brotherhood Ltd, 17,500 pounds, ? July 1959) PSPC/P51 and NI(GP)(59)23 Alteration to the Magnet Power Supply contract for Nimrod (Highly desirable change to the magnet current waveform requires upgrade to interphase reactor designed by Brown Boveri, 17 July 1959) PSPC/P52 and NI(GP)(59)31 Revision of Nimrod estimate (Revision of finances now that estimates are becoming more reliable, 9 October 1959) PSPC/P54 and NI(GP)(59)30 Nimrod Quarterly Statement no.8 (Includes list of suppliers, 9 October 1959)
1960
PSPC/P58 and NI(GP)(60)2 Nimrod Project: Quarterly Statement no.9 (22 December 1959) PSPC/P60 and NI(GP)(60)19 Machine estimates for Nimrod (Review of costs and issues for each of the main components, 4 May 1960) PSPC/P65 and NI(GP)(60)20 Main Vacuum Chamber for Nimrod (Includes summary of development work and itemised costs, 4 May 1960) PSPC/P66 and NI/GP/60/26 Proposed contract for Ripple Filter Transformers for Nimrod (Contract with AEI, equipment required for power supply, 30 May 1960) PSPC/P67 and NI/GP/60/27 Main Pole Face Windings for Nimrod (Contract with Marston Excelsior, 29 June 1980) PSPC/P70 and NI/GP/60/29 Three Nimrod plant contracts (RF drive chain, power supply foundation block and main vacuum chamber, 26 July 1960) PSPC/P73 and NI/GP/60/33 Nimrod Magnet Coil Installation (Contract to be placed with AEI, previously known as Metropolitan Vickers, 22 and 30 August 1960) PSPC/P74 and NI/GP/60/45 Development contract with Marston Excelsior Ltd for the main vacuum chamber (Duplicate paper number; Progress report and revised costs, 30 September 1960) PSPC/P78 and NI/GP/60/47 Nimrod vacuum chamber (Includes progress report, 9 December 1960)
Briefing notes and minutes
PSPC/A19 Action points for Percy Bowles (25 March 1960) PSPC/B19 Chairman's briefing notes (25 March 1960) PSPC/M19 Meeting minutes (8 April 1960) PSPC/B21 Chairman's briefing notes (2 November 1960)
1961
No papers yet
Briefing notes and minutes
PSPC/B22 Chairman's briefing notes (25 January 1961) PSPC/B23 Chairman's briefing notes (11 April 1961) PSPC/B24 Chairman's briefing notes (27 June 1961) Note to FA Vick (undated but context indicates either June or November meeting) PSPC/B24 Chairman's briefing notes (16 November 1961)
1962
PSPC/P97 and NI/GP/62/13 Nimrod Vacuum Chamber being manufactured at Marston Excelsior Ltd (includes details of contract renegotiation, 7 March 1962)
1963
PSPC/P104 Quarterly statement No.23 (1963) PSPC/P105 Revised cost estimates (20 September 1963) PSPC/P106 The first operation of Nimrod to full energy (Report by Mullett, 20 September 1963) PSPC/P107 Final Report (Includes narrative description of the project, construction work, first operation to full energy, 11 November 1963)

NIMC-P01 Management Committee for the new Injector for Nimrod (17 January 1973)

Minutes of the first meeting (22 January 1960) Minutes of Rutherford Laboratory Steering Committee (3 February 1960)

NI/V/60 Minutes of the meeting held at RHEL (11 November 1960)

Notes for initial allocation of machine time for experiments on Nimrod (includes table for comparison of requirements, 15 August 1963) Note from Taylor to Stafford concerning recent accelerator developments (4 September 1963) Outline of Nimrod commissioning programme compiled from Nimrod commissioning meeting no.45 (9 September 1963) Initial HEP program for Nimrod: Notes for Experiments Committee from standpoint of Machine Operations (Note from Hobbis; Outline of Nimrod commissioning and recommended scheduling policy to December 1964; 10 September 1963)

1950s
Notes on the Bubble Chamber meeting (20 September 1957) Minutes of the British National Hydrogen Bubble Chamber Working Party at Birmingham University (2 May 1958); notes on auxiliary equipment (13 October 1958) NEPC/M/1 Minutes of a meeting to discuss Hydrogen Bubble Chamber Services (10 June 1959) HL 59/8268 Nuclear Equipment Project Committee (Terms of reference by LB Mullett, 19 November 1959)
1960s
Memo regarding Treasury approval for Hydrogen Bubble Chamber Services (24 November 1960) DSIR Grant for construction of a Large Hydrogen Bubble Chamber: Statement of expenditure (23 March 1961) Track analysis work (Note by M Snowden, 13 July 1961) Data reduction for Bubble Chambers (Technical note and covering memo from Pickavance, 17 April 1962) HeMCM/1 Minutes of the first meeting held at Rutherford Laboratory (30 May 1962) Track analysis work at the Rutherford Laboratory (Technical note, 3 October 1962) Meeting concerning Saclay Bubble Chamber (Minutes, 14 April 1964) Saclay 82cm Liquid Hydrogen Bubble Chamber (Technical note, 1964) N-01-64 French Bubble Chamber comes to the Rutherford Laboratory (Press Release, 1964) Precision CRT device for track analysis (Technical note, 30 March 1965) Bubble Chamber Group Meetings: Progress meetings on BC installation and progress meetings on BC operation (3 November 1965) Minutes of New Bubble Chamber Design Studies meeting (12 November 1965) NEPC/Part III/M30 Minutes and appendices of the final meeting of the Heavy Liquid Bubble Chamber Section of the Nuclear Equipment Project Committee at RL (25 November 1965) NEPC/Part III/M31 Minutes of the Heavy Liquid Bubble Chamber Section of the Nuclear Equipment Project Committee at RL (25 November 1965) Minutes of New Bubble Chamber Design Studies meeting (6 December 1965) NP.6(66) Heavy Liquid Bubble Chamber: Completion of Project (6 January 1966) Minutes of New Bubble Chamber Design Studies meeting (11 January 1966) HeMCP/44 Helium Bubble Chamber Project N45/4/15 Financial Statement for period 1 July 1962 - 30 June 1966 (7 July 1966) HeMC/13 Minutes of the final meeting held at Rutherford Laboratory (27 April 1967) NP.60(67) Completion of Helium Bubble Chamber Project (24 May 1967) Minutes of Track Chamber Panel (6 November 1967) HeMCP/43 Helium Bubble Chamber Management Committee: Progress Report (28 June 1968) HLBC Progress (top-level timetable, 1968)
1970s
Data on bubble chamber operations (Note from M Snowden, Technology Division, 11 February 1977)

Finance Sub committee: Financial procedures (as at 17 January 1969) Financial procedures: VAT (22 June 1973)

List of Senior Staff and positions (part of a longer document, very early 1960s because it includes JJ Wilkins who died in a car accident on 17 October 1962) The National Institute for Research in Nuclear Science (Draft of part of a book chapter or paper; undated but mentions Nimrod under construction so very early 1960s) Letter from Stafford to Cockcroft concerning Accelerator Working Party meetings for the second national laboratory (29 February 1960) Minutes of the First Ordinary Meeting of the Housing Committee in Mr Snowden's office, R1 (2 March 1961) RLN.3 Rutherford Laboratory Notice no.3: Radiation protection at the Rutherford Laboratory (22 March 1960) Memo: Christmas celebrations (12 December 1962) Memo: Distribution of notices and circulars (28 December 1962) Memo: Vehicle Identity Labels (10 May 1963)

⇑ Top of page
© Chilton Computing and UKRI Science and Technology Facilities Council webmaster@chilton-computing.org.uk
Our thanks to UKRI Science and Technology Facilities Council for hosting this site