Contact us Heritage collections Image license terms
HOME ACL ACD C&A INF SE ENG Alvey Transputers Literature
Further reading □ OverviewTrip USA 1986Future UnixSun Common LispSEG Notes 1-142Unix Notes 1-19 □ Software and Engineering Group (SKEG) □ SKEG203SKEG205SKEG206SKEG208SKEG217SKEG219 □ Other □ Glossary of acronyms
CCD CISD Archives Contact us Heritage archives Image license terms

Search

   
InformaticsLiteratureNotes
InformaticsLiteratureNotes
ACL ACD C&A INF CCD CISD Archives
Further reading

Overview
Trip USA 1986
Future Unix
Sun Common Lisp
SEG Notes 1-142
Unix Notes 1-19
Software and Engineering Group (SKEG)
SKEG203
SKEG205
SKEG206
SKEG208
SKEG217
SKEG219
Other
Glossary of acronyms

SEG Notes: 1-142

The list below gives the titles of some of the Software Engineering Group Notes from 1 to 142. An index for the complete set has not been discovered. If several drafts of the same report are Notes, only the latest is available as a PDF.

Number Title Author Date
1 SEG Annual Report RWW 17.10.84
3 Production of SEG Notes: Use of maco package and proforma DRG 17.10.84
14 ACARD WG on SE RWW 8.1.85
19 Visit to Keele 25.1.85 RWW 29.1.85
21 UK UNIX User Group Mtg 1.2.85 DRG 5.2.85
23 ACARD WG on SE Visit to NCC 5.2.85 RWW 12.2.85
24 ACARD WG on SE Meeting 8.2.85 RWW 13.2.85
35 Equipment Loan Pool of PERQs RWW 1.4.85
39 ACARD WG on SE: The Danger to Public Safety Draft 2 RWW 16.4.85
54 Move to R1 - Requirements LEV 11.6.85
55 ESRC Public Policy Study Group Seminar: Impact of New Technology 7.6.85 RWW 12.6.85
59 ACARD WG on SE: The Danger to Public Safety Draft 4 RWW 4.7.85
60 ACARD WG on SE: The Danger to Public Safety RWW 10.7.85
64 SEG FYFL 1986/92 RWW 31.7.85
66 Dimensional design: Minutes of Meeting 31.7.85 RWW 6.8.85
68 National Programmes RWW 2.9.85
72 Dimensional Design: Minutes of Meeting 25.9.85 DRG 27.9.85
74 SEG Annual Report Sept 84 - Sept 85 RWW 30.9.85
82 END GAME DEBATE Some Questions RWW 13.11.85
83 END GAME DEBATE Some Agenda Items RWW 13.11.85
84 END GAME DEBATE Have we Implemented the Yellow Book? RWW 13.11.85
87 Dimensional design: Informal Requirements Specification Draft 2 DRG 26.11.85
94 Alvey SE Visit to USA Oct 85 Private Version RWW 4.11.85
95 Alvey SE Visit to USA Oct 85 RWW 4.11.85
96 ACARD WG on SE Final Report Draft 8.6 RWW 17.3.86
101 SE Research at RAL DAD 13.2.86
106 Minutes of SIG-SE Meeting 28 Feb 1986 Draft 1 RWW 4.3.86
107 After Alvey: Some Headings RWW 4.3.86
108 DTI/MOD Alignment Text of RWW's Presentation Draft 1 RWW 6.3.86
109 DTI/MOD Alignment Text of RWW's Presentation RWW 13.3.86
110 ACARD WG on SE Final Report AT/RWW 21.3.86
111 Dimensional design: Requirements Specification for Protype DRAFT 2.2 DRG 21.3.86
113 BASSMAT Further Thoughts RWW 26.3.86
115 After Alvey: A Note for the IEE Mtg 11/4/86 RWW 2.4.86
116 Dimensional Design: A Layout Algorithm for the Labelled Cuboid Model RWW/DRG 14.4.86
125 China Trip Report May 1986 RWW 29.5.86
126 Staffing DAD 2.6.86
127 IPSE 2.5 Note 2 Monthly Progress Report May 1986 CPW 2.6.86
130 Visit to South China IT, Guangzhou April-May 1986 RWW 3.6.86
131 IPSE 2.5 Note 2 Monthly Progress Report May 1986 CPW 10.6.86
133 Alvey Funded Effort at RAL SE Activities RWW 13.6.86
134 FYFL 1987-1993 RWW 16.6.86
135 Estimates 1987/88 Draft 1 RWW 16.6.86
136 Estimates 1987/88 RWW 17.6.86
138 ACARD WG on SE Notes for G Holmes Speech to Alvey 86 Conference RWW 26.6.86
142 Dimensional Design: Requirements Specification for Prototype, Draft 3 DRG 20.8.86
149 Alvey IPSE Strategy and Academia RWW 8.10.86
⇑ Top of page
© Chilton Computing and UKRI Science and Technology Facilities Council webmaster@chilton-computing.org.uk
Our thanks to UKRI Science and Technology Facilities Council for hosting this site