LogoAtlas Building

Jump To Main Content

Jump Over Banner

Home

Jump Over Left Menu

Building

Overview

Finding a Site

1962

Early 1963

Late 1963

Feb 1964

March 1964

July 1964

Phase 2: 1966

Phase 2:1967

Phase 2:1967

Fish Tank

1971 Onwards

Return

This site is best viewed using a browser with either native SVG support or an SVG Plug-in

Access Key Details

6 February 1964

This is the upper level where the Atlas peripherals will be housed. The window to the right is the service window through which can be seen the data preparation area.

Atlas Machine Room Upstairs

Atlas Machine Room Upstairs
Large View

The first photo is taken from the doorway into the tape and card store. Later, Jim Hailstone would install a robot tape store in this area.

Tape and Card Store

Tape and Card Store
Large View

the data Preparation area with the service window into the Atlas machine room on the left.

Data Preparation Area

Data Preparation Area
Large View

By now, the building is nearly ready for takeover

Nearly Finished

Nearly Finished
Large View

But there is still a bit of cleaning up to do!

Entrance Hall

Entrance Hall
Large View