Contact us Heritage collections Image license terms
HOME ACL Associates Technology Literature Applications Society Software revisited
Further reading □ OverviewFinding a site1962Early 1963Late 1963February 1964March 1964July 1964Phase 2: 1966Phase 2: 1967Phase 2: 1967Fish tank1971 onwards
ACD C&A INF CCD CISD Archives Contact us Heritage archives Image license terms

Search

   
ACLTechnologyAtlas Building :: Atlas Building
ACLTechnologyAtlas Building :: Atlas Building
ACL ACD C&A INF CCD CISD Archives
Further reading

Overview
Finding a site
1962
Early 1963
Late 1963
February 1964
March 1964
July 1964
Phase 2: 1966
Phase 2: 1967
Phase 2: 1967
Fish tank
1971 onwards

March 1964: Handover

Phase 1 Atlas Processor Dark Room Void Ancillary Equipment Room A1 Data Preparation Lift Think Room F12 F13 F14 F15 (F16) Stairs F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 Kitchen Common Room "/> Ladies First Floor
First Floor Plan Phase 1

The building is handed over. Phase 1 is complete. The top five offices in the Office Block house Dr Howlett, his Secretary Synolda Butler, Bob Churchhouse, Anita, Bob and Jim's Secretary, Jim Hailstone.

Downstairs the first Office is shared by Bob Hopgood and Alex Bell, next contains Suzette Harold.

Handover: Office Block

Handover: Office Block
Full image ⇗
© UKRI Science and Technology Facilities Council

The completion of Phase 1. The Atlas Laboratory Land Rover is in the Car Park as are Alex Bell's mini van and Barbara Stokoe's mini.

Completed Building

Completed Building
Full image ⇗
© UKRI Science and Technology Facilities Council

The lower floor on the back side of the Office Block (see next photo) was a set of cells, small offices about six feet wide allocated to visitors on a weekly basis. Each large window is shared by two offices. During the life of the building, some of the partitions were removed to turn them into larger offices but some remained as cells for the life of the building.

Back of Office Block

Back of Office Block
Full image ⇗
© UKRI Science and Technology Facilities Council

The first of some staged photographs to mark the completion. Jack Howlett talks to Dorothy Phelps, head of Data Preparation.

Dorothy Phelps and Jack Howlett

Dorothy Phelps and Jack Howlett
Full image ⇗
© UKRI Science and Technology Facilities Council

Data Preparation area with card punches at the front and paper tape Flexowriters at the back. Seated in the front row are ?, Dorothy Phelps and Eileen Perkins. In the second row are ? and ?. In the third row are Jo Turner and ?. Alex Bell sits at a Flexowriter nearly hidden from view

Data Preparation Area

Data Preparation Area
Full image ⇗
© UKRI Science and Technology Facilities Council
Phase 1 Alternator Room Garage Atlas Processor Air Conditioning Plant Room G48 G47 G46 Workshop Post Room Lift Original Entrance G19 G20 G21 G22 (G23) (G24) Stairs G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 G13 G14 G15 G16 G17 G18 Transport Calorifier Room "/> Gents /> /> /> Fermi Avenue Ground Floor
Ground Floor Plan: Phase 1
⇑ Top of page
© Chilton Computing and UKRI Science and Technology Facilities Council webmaster@chilton-computing.org.uk
Our thanks to UKRI Science and Technology Facilities Council for hosting this site