Contact us Heritage collections Image license terms
HOME ACL Associates Technology Literature Applications Society Software revisited
Further reading □ Overview1 Logging System2 Console Teletype3 June-July 19754 Settings5 Maintenance6 Errors7 Simulator8 Copy Tape9 Defaults10 Dumping11 Logging12 Aug-Oct 197513 360 Graphics14 Print, Oxford15 Print, RL16 Minutes Nov 1976
ACD C&A INF CCD CISD Archives Contact us Heritage archives Image license terms

Search

   
ACLLiteratureProgress ReportsFR80 Operations :: FR80 Operations
ACLLiteratureProgress ReportsFR80 Operations :: FR80 Operations
ACL ACD C&A INF CCD CISD Archives
Further reading

Overview
1 Logging System
2 Console Teletype
3 June-July 1975
4 Settings
5 Maintenance
6 Errors
7 Simulator
8 Copy Tape
9 Defaults
10 Dumping
11 Logging
12 Aug-Oct 1975
13 360 Graphics
14 Print, Oxford
15 Print, RL
16 Minutes Nov 1976

Minutes of Meeting No 3, on 2 November 1976

C D Osland

3 December 1976

1. In the Minutes of Meeting No. 2, para 5.2, the change in the time constant should have been stated to be in the hardware, not in the programs. The minutes were otherwise accepted.

2. Matters Arising

2.1 R Brandwood has delayed introducing the full activity log until t4e FR80 had moved and the 1906A restarted.

2.2 C Osland has added the parameter to DESPOOL to provide two copies of its output. At present Atlas have not been using this. C Osland will provide a list of remote workstation names and numbers, as the output refers to them by number. This will enable the output to be posted directly from R26/27.

2.3 H Hurst has talked to III, and the results are covered in detail in section 7 below.

2.4 H Hurst has not yet talked to NBRU, but when he does, he will mention the possibility of them using "many-up" hardcopy as well as 35 mm film.

3. Software Performance

The new tube has meant that all output has to be struck twice to maintain the same. intensity as the old tube. Modifying the software to achieve this took about 4 hours. The number of hits may have to be increased to 4, which would roughly double plotting time.

4. Hardware

A summary is appended which covers the last 8 weeks.

4.1 Film and Hardcopy Processors

The hardcopy processor was down for 3 days: this happened because the FR80 tube was down at the same time, and so the III engineer worked on the tube first. This processor is now 8 years old and spares may become difficult to obtain. No spares are held on site and it is maintained by III.

4.2 Tube and PLS Logic

The tube replacement took about one week. The PLS logic has failed 4 times, and the III engineer suspects that transistors should be supplied to him by III in matched pairs, and that this is not happening.

4.3 Cameras

The hardcopy camera and the vacuum system used by the microfiche and hardcopy cameras have each been down for some time, but neither affected use of the other cameras.

4.4 Other Factors

The move of the FR80 was accomplished very easily and there have been no associated problems.

There appears to be a problem with the selection of filters, causing filters not to move fast enough and failing to arrive correctly in place. The III engineer is investigating this at present, to establish whether the problem is caused by filters, intensity or a solenoid. The effect on colour runs can be catastrophic, but so far there has only been one user complaint, associated with intensity variation. It was suggested that the possibility of installing a probe to monitor PLS intensity should be investigated. This would be useful for establishing whether PLS. intensity variation was a basic cause.

5. Operations

5.1 Operational Schedule

This is unchanged from previous arrangements. The only remaining problem is the scheduling of jobs of unknown characteristics which are subsequently found to require a long plotting time. This does not affect turnaround as seen by the user to any large extent.

5.2 Courier System

R Brandwood has talked to G Lambert about the courier and the problems have been discussed and solved.

5.3 Workload

A breakdown of the usage of the FR80 since April is attached. Microfiche is now the principal medium used. October's figures for plotting time are influenced by the double striking required on the new tube, which increases plotting time by 25%. The overall workload has been increasing. The backlog created by the move of the FR80 has now been cleared.

5.4 Staffing

One person is leaving at the end of November. The possibility of working with 2 operators on 2-shifts was discussed. A trawl for staff continues.

6. Film Processing

P Nelson noted that the FR80 output quality is currently limited by the film processing arrangements. He asked whether it was the intention to transfer this work to Photographic Section. H Hurst said I. that he hoped this would happen in the next 3 to 6 months, and that he is in contact with J Valentine on this topic. R Brandwood noted that the III engineer will need film processing equipment close to the FR80 for setting up. R Lawes stated that he considered that using film processing as a part of a procedure for setting up the FR80 was basically incorrect since it introduced too many extra variables.

7. Meeting with III

7.1 The meeting took place on September 29 and H Hurst sent notes on the discussion to III. He has received a reply from J Lines (Managing Director of III) which comments on several points. The meeting discussed the various points.

(a) J Lines stated that it was III policy to hold spare tubes in Los Angeles. The meeting agreed that the problem is the actual availability of a tube fully up to specification, not the.logical possibility of transporting the tube to us within 24 hours.

(b) J Lines stated that III could not offer compensation for the non-availability of the high speed character generator. III have separately stated that it is used in the IBM print program, but not used in ICL print program. P Nelson will check this and consult R Witty about his results.

(c) III have now quoted for refurbishing the SD4020 camera so that it is usable by the FR80. A decision is now required as to whether or not the camera should be converted or otherwise offered for disposal.

J Lines confirmed that the other points raised were in the process of investigation and he would expect replies to be forthcoming in the very near future.

8. Maintenance

8.1 R Lawes has had some preliminary discussions with: R Brandwood about maintenance of the FR80. He felt that RL was capable of maintaining the FR80 and that this could become the responsibility of a team which maintained the FR80, HPD's and microdensitometer.

8.2 R Lawes noted that hardware maintenance. without adequate software support would be futile.

8.3 We would still rely on III for spares, but it was thought that this would be acceptable. GCHQ are about to embark on the same project, and should be contacted to exchange ideas. It was thought that in the event of us switching over to doing our own maintenance, we should negotiate a 'backup' arrangement with III.

9. Other Business

9.1 The film processors we used for backup (Micromedia) have now moved to Bicester from Oxford. Since this will create extra delays, it was agreed to see if we could find someone more local.

9.2 It was requested that the 195 DESPOOL system should be made similar to the 1906 when the 195's are running in R27. C Osland said that this would be taken into consideration when the many deficiencies of the 195 DESPOOL were looked at, i.e. after the Dual 195 system was operational.

9.3 P Nelson mentioned that the frame counters had been removed from the SD4020 before it was scrapped and were available if needed.

9.4 It was requested that the accounting of IBM COM output be improved: C Osland indicated that this was again a function of the 195 DESPOOL and could not be provided until the Dual 195 system was operational.

9.5 P Nelson asked whether it was simple to acquire a private tape for spool output on the 195, as is possible on the 1906A. This is sometimes needed because of plotting or processing faults noted by the user. C Osland stated that this was difficult on the 195 because of the different software structures on the 2 computers.

9.6 P Nelson stated that it is now known that 50% of the jobs which use their own tape only produce a quantity of output that would fit on spool.

9.7 P Nelson mentioned that he was obtaining details of microfiche titling and uantor COM from Eurocomp.

10. Next Meeting

Tuesday 14 December at 1100 in the Director's Conference Room No 2, Building R1.

APPENDIX A

HARDWARE SUMMARY 

UNIT             NO. OF FAULTS   DOWNTIME (HRS)   
--             
Film Processor         1              1   
Hardcopy Processor     1              3 days   
Cameras:           
  Hardcopy             1             21   
  Microfiche           0      
  16 mm Precision      0      
  16/35 Combined       0         
  Tape Decks           1 (9-track)    8   
  Teletype             0
  CPU and Disk         0 
* PLS and Analog       4             16.5  
  Power Supplies       0 
  Field Changes        0         
  Other           
(vacuum motor failed)  1              4   

* Indicates faults that meant no work could be done at all. 
  PLS replaced - documented. 

APPENDIX B

WORKLOAD SUMMARY                     
                APRIL   MAY   JUNE   JULY   AUGUST   SEPT   OCT     (Incomplete)   
NO. OF JOBS                     
H/C              817   1065   1231    928    952     691    862     
BW35             157    221    180    120     65      77     37     
CL35             51      99     62     58     27      20     53     
BW16             21      16     16     38     27      31     39     
CL16             34       8      3     18      6       2      0     
MFCH            669     606    340    382    375     290    289     
TOTAL          1749    2017   1832   1544   1452    1111   1280     

360 SPOOL                     
NO. OF JOBS    1041    1049   1112    834    685     773         
1906A SPOOL                     
NO. OF JOBS     485     716    683    392    538     382         
TIME/CAMERA                     
H/C           14.34   19.21   25.38  18.34  21.32  14.29  19.39     
BW35           4.00    9.31    8.22   6,10   5.28   7.44   3.42     
CL35           4.13   11.52   13.33  18.43   5.50   3.36  14.57     
BW16           1.30    1.55    2.28   8.43   7.16   7.16  11.29     
CL16          23.30    2.15    0.20  16.18   2.20   0.20   0.00     
MRCH          37.16   39.44   28.43  29.57  41.56  48.13  54.31     
TOTAL         85      87      79     98     84     81    104       
                     
FRAMES/ CAMERA                     
H/C           9378    11444   15634   9697  11845   7892  10691     
BW35          2696     3730    2702   2575   2879   3274   1514     
CL35           744     4189     988   2635    522    274   1991     
BW16          7415    11324   11457  48365  33415  27534  32261     
CL16         16492     1104      36  ll071   4130     27         
MFCH          1883     1636     993    962   1010    743   1783     

⇑ Top of page